Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1992
Principal Product REBUILT AUTO STARTERS
NAICS n/a
SIC 3694 - Engine Electrical Equipment
Sales $50,000,000-$100,000,000
# of Employees 600
Plant Area (Sq.Ft.) 0
Annual Production 4,500,000 Pieces
Production Hrs. Annual 4,290
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $219,692 3,623,095 kWh $0.06
Natural Gas $36,603 12,241 MMBtu $2.99
TOTAL ENERGY COSTS $256,295
RECOMMENDED SAVINGS* $27,248 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,875
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$118
Cost:
$423
$224 3,810 $(-106) - $224
3,810
kWh
$(-106)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,589
Cost:
$1,399
$4,685 97,890 $(-1,096) - $4,685
97,890
kWh
$(-1,096)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$978
Cost:
$1,060
$812 13,482 $166 - $812
13,482
kWh
$166
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$224
Cost:
$236
$169 3,517 $55 - $169
3,517
kWh
$55
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,966
Cost:
-
$5,166 150,645 $(-200) - $5,166
150,645
kWh
$(-200)
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,621
Cost:
$6,979
$5,621 117,233 - - $5,621
117,233
kWh
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,752
Cost:
$36,300
$11,752 342,614 - - $11,752
342,614
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$27,248
Cost:
$46,397
$28,429 729,191 $(-1,181) - $28,429
729,191
kWh
$(-1,181)
-
$
TOTAL IMPLEMENTED Savings:
$9,875
Cost:
$3,118
$11,056 269,344 $(-1,181) - $11,056
269,344
kWh
$(-1,181)
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes