Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1992
Principal Product STAINLESS STEEL TUBING
NAICS n/a
SIC 3317 - Steel Pipe And Tubes
Sales $10,000,000-$50,000,000
# of Employees 56
Plant Area (Sq.Ft.) 0
Annual Production 21,000 Thousand Feet
Production Hrs. Annual 8,736
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $187,896 2,980,363 kWh $0.06
Natural Gas $7,129 1,327 MMBtu $5.37
TOTAL ENERGY COSTS $195,025
RECOMMENDED SAVINGS* $31,156 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,791
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$20,408
Cost:
$1,580
$20,408 375,733 - - - - $20,408
375,733
kWh
-
-
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,003
Cost:
$8,297
$5,003 101,407 - - - - $5,003
101,407
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,457
Cost:
$1,131
$3,283 62,134 - - $(-826) - $3,283
62,134
kWh
-
-
MMBtu
$(-826)
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,087
Cost:
$1,276
$1,087 20,516 - - - - $1,087
20,516
kWh
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$832
Cost:
-
$832 20,809 - - - - $832
20,809
kWh
-
-
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$615
Cost:
$2,279
$615 12,309 - - - - $615
12,309
kWh
-
-
MMBtu
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$612
Cost:
$1,922
- - $612 115 - - -
-
kWh
$612
115
MMBtu
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$135
Cost:
$318
$135 2,052 - - - - $135
2,052
kWh
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7
Cost:
$111
$21 293 - - $(-14) - $21
293
kWh
-
-
MMBtu
$(-14)
-
$
TOTAL RECOMMENDED Savings:
$31,156
Cost:
$16,914
$31,384 595,253 $612 115 $(-840) - $31,384
595,253
kWh
$612
115
MMBtu
$(-840)
-
$
TOTAL IMPLEMENTED Savings:
$24,791
Cost:
$4,098
$25,631 479,485 - - $(-840) - $25,631
479,485
kWh
-
-
MMBtu
$(-840)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes