Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1993
Principal Product Elevator Cabs and related products
NAICS n/a
SIC 3534 - Elevators And Moving Stairways
Sales $5,000,000-$10,000,000
# of Employees 94
Plant Area (Sq.Ft.) 60,700
Annual Production 1,000 Pieces
Production Hrs. Annual 4,590
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $39,689 747,069 kWh $0.05
Natural Gas $23,066 5,599 MMBtu $4.12
TOTAL ENERGY COSTS $62,755
RECOMMENDED SAVINGS* $4,866 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,137
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,312
Cost:
$3,809
$1,312 19,343 - - $1,312
19,343
kWh
-
-
MMBtu
02: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$1,494
Cost:
$898
- - $1,494 383 -
-
kWh
$1,494
383
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$864
Cost:
-
$864 20,809 - - $864
20,809
kWh
-
-
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$779
Cost:
$1,600
- - $779 200 -
-
kWh
$779
200
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$238
Cost:
$527
- - $238 61 -
-
kWh
$238
61
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$179
Cost:
$217
$179 3,517 - - $179
3,517
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$4,866
Cost:
$7,051
$2,355 43,669 $2,511 644 $2,355
43,669
kWh
$2,511
644
MMBtu
TOTAL IMPLEMENTED Savings:
$3,137
Cost:
$2,498
$864 20,809 $2,273 583 $864
20,809
kWh
$2,273
583
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas