IAC logo
IAC Assessment: OK0405
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0405
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1993
Principal Product Telephone Switch Gear Equipment
NAICS n/a
SIC 3661 - Telephone And Telegraph Apparatus
Sales $1,000,000-$5,000,000
# of Employees 360
Plant Area (Sq.Ft.) 201,000
Annual Production 120,000 Pieces
Production Hrs. Annual 4,420
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $257,307 5,025,791 kWh $0.05
Natural Gas $20,099 5,273 MMBtu $3.81
TOTAL ENERGY COSTS $277,406
RECOMMENDED SAVINGS* $11,644 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,239
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,583
Cost:
$22,620
$5,583 92,907 $5,583
92,907
kWh
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,013
Cost:
-
$2,013 26,964 $2,013
26,964
kWh
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,502
Cost:
$3,116
$1,502 22,860 $1,502
22,860
kWh
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,068
Cost:
-
$1,068 22,567 $1,068
22,567
kWh
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$741
Cost:
$2,200
$741 24,912 $741
24,912
kWh
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$316
Cost:
-
$316 12,016 $316
12,016
kWh
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$272
Cost:
$512
$272 2,052 $272
2,052
kWh
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$149
Cost:
$513
$149 2,638 $149
2,638
kWh
TOTAL RECOMMENDED Savings:
$11,644
Cost:
$28,961
$11,644 206,916 $11,644
206,916
kWh
TOTAL IMPLEMENTED Savings:
$2,239
Cost:
$4,141
$2,239 39,566 $2,239
39,566
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage