IAC logo
IAC Assessment: OK0406
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0406
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1993
Principal Product Beef patties, sauage patties, and sl
NAICS n/a
SIC 2013 - Sausages And Other Prepared Meats
Sales $100,000,000-$500,000,000
# of Employees 230
Plant Area (Sq.Ft.) 96,900
Annual Production 135,200,000 Pounds
Production Hrs. Annual 7,020
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $591,166 11,541,325 kWh $0.05
Natural Gas $119,927 48,803 MMBtu $2.46
TOTAL ENERGY COSTS $711,093
RECOMMENDED SAVINGS* $14,789 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,431
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$5,463
Cost:
$17,950
$5,463 584,408 - - $5,463
584,408
kWh
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,360
Cost:
$2,320
$2,360 61,547 - - $2,360
61,547
kWh
-
-
MMBtu
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,510
Cost:
$350
$1,510 43,669 - - $1,510
43,669
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,331
Cost:
$2,162
$1,331 15,240 - - $1,331
15,240
kWh
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,137
Cost:
-
$1,137 32,825 - - $1,137
32,825
kWh
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$758
Cost:
$383
- - $758 308 -
-
kWh
$758
308
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$659
Cost:
$2,322
$659 6,741 - - $659
6,741
kWh
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$656
Cost:
$1,134
$656 14,947 - - $656
14,947
kWh
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$547
Cost:
$832
$547 5,569 - - $547
5,569
kWh
-
-
MMBtu
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$368
Cost:
$432
$368 10,551 - - $368
10,551
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$14,789
Cost:
$27,885
$14,031 775,497 $758 308 $14,031
775,497
kWh
$758
308
MMBtu
TOTAL IMPLEMENTED Savings:
$7,431
Cost:
$9,552
$7,431 158,264 - - $7,431
158,264
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas