IAC Assessment: OK0407
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0407
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1993
Principal Product Heat Recovery Steam Generators
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $50,000,000-$100,000,000
# of Employees 205
Plant Area (Sq.Ft.) 143,500
Annual Production 0 Units
Production Hrs. Annual 6,630
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $153,044 2,589,390 kWh $0.06
Natural Gas $89,712 30,071 MMBtu $2.98
TOTAL ENERGY COSTS $242,756
RECOMMENDED SAVINGS* $33,152 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,759
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$23,207
Cost:
$118,871
- - $23,207 7,043 -
-
kWh
$23,207
7,043
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,004
Cost:
-
$4,004 79,426 - - $4,004
79,426
kWh
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,186
Cost:
$360
$2,186 26,964 - - $2,186
26,964
kWh
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,059
Cost:
-
$2,059 64,185 - - $2,059
64,185
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$971
Cost:
$903
$971 13,189 - - $971
13,189
kWh
-
-
MMBtu
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$725
Cost:
$750
- - $725 223 -
-
kWh
$725
223
MMBtu
TOTAL RECOMMENDED Savings:
$33,152
Cost:
$120,884
$9,220 183,764 $23,932 7,266 $9,220
183,764
kWh
$23,932
7,266
MMBtu
TOTAL IMPLEMENTED Savings:
$7,759
Cost:
$1,653
$7,034 156,800 $725 223 $7,034
156,800
kWh
$725
223
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas