IAC logo
IAC Assessment: OK0413
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0413
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1993
Principal Product Plastic Cups, Bowls, and Plates
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $100,000,000-$500,000,000
# of Employees 600
Plant Area (Sq.Ft.) 250,000
Annual Production 6,500,000 Pounds
Production Hrs. Annual 6,624
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,574,754 46,316,531 kWh $0.03
Natural Gas $63,728 15,112 MMBtu $4.22
TOTAL ENERGY COSTS $1,638,482
RECOMMENDED SAVINGS* $50,358 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,499
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,243
Cost:
$39,528
$13,243 389,508 - - $13,243
389,508
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,746
Cost:
$19,728
$6,746 123,974 - - $6,746
123,974
kWh
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,510
Cost:
-
$4,510 137,163 - - $4,510
137,163
kWh
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$15,458
Cost:
$7,400
- - $15,458 3,663 -
-
kWh
$15,458
3,663
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$10,401
Cost:
$5,910
$10,401 - - - $10,401
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$50,358
Cost:
$72,566
$34,900 650,645 $15,458 3,663 $34,900
650,645
kWh
$15,458
3,663
MMBtu
TOTAL IMPLEMENTED Savings:
$24,499
Cost:
$59,256
$24,499 650,645 - - $24,499
650,645
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas