IAC Assessment: OK0423
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1994
Principal Product Millwork, Doors, Cabinets, Furniture
NAICS n/a
SIC 2431 - Millwork
Sales $1,000,000-$5,000,000
# of Employees 45
Plant Area (Sq.Ft.) 49,000
Annual Production 0 Units
Production Hrs. Annual 3,120
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $25,110 325,909 kWh $0.08
Natural Gas $9,977 2,661 MMBtu $3.75
TOTAL ENERGY COSTS $35,087
RECOMMENDED SAVINGS* $5,028 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,501
Cost:
$5,000
$1,501 20,516 - - $1,501
20,516
kWh
-
-
MMBtu
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,402
Cost:
$2,800
- - $1,402 417 -
-
kWh
$1,402
417
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$901
Cost:
$3,906
$901 6,448 - - $901
6,448
kWh
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$662
Cost:
-
$662 9,379 - - $662
9,379
kWh
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$296
Cost:
-
$296 4,103 - - $296
4,103
kWh
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$266
Cost:
$880
- - $266 77 -
-
kWh
$266
77
MMBtu
TOTAL RECOMMENDED Savings:
$5,028
Cost:
$12,586
$3,360 40,446 $1,668 494 $3,360
40,446
kWh
$1,668
494
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas