IAC logo
IAC Assessment: OK0430
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0430
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1994
Principal Product wire mesh, wire screens
NAICS n/a
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $5,000,000-$10,000,000
# of Employees 75
Plant Area (Sq.Ft.) 77,000
Annual Production 800 Pieces
Production Hrs. Annual 2,600
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,527 997,069 kWh $0.06
Natural Gas $10,723 2,276 MMBtu $4.71
TOTAL ENERGY COSTS $68,250
RECOMMENDED SAVINGS* $6,440 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,876
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,200
Cost:
$5,400
$2,200 22,860 - - $2,200
22,860
kWh
-
-
MMBtu
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,505
Cost:
$900
- - $1,505 385 -
-
kWh
$1,505
385
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,262
Cost:
$1,173
$1,262 22,567 - - $1,262
22,567
kWh
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$909
Cost:
-
$909 16,120 - - $909
16,120
kWh
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$305
Cost:
$1,600
$305 22,860 - - $305
22,860
kWh
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$191
Cost:
$444
$191 3,517 - - $191
3,517
kWh
-
-
MMBtu
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$68
Cost:
-
$68 1,172 - - $68
1,172
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$6,440
Cost:
$9,517
$4,935 89,096 $1,505 385 $4,935
89,096
kWh
$1,505
385
MMBtu
TOTAL IMPLEMENTED Savings:
$5,876
Cost:
$7,473
$4,371 61,547 $1,505 385 $4,371
61,547
kWh
$1,505
385
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas