IAC logo
IAC Assessment: OK0447
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0447
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1994
Principal Product Corrugated shipping containers
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 124
Plant Area (Sq.Ft.) 139,000
Annual Production 725,000 Thousand Feet
Production Hrs. Annual 6,864
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $240,519 4,508,793 kWh $0.05
Natural Gas $103,502 51,912 MMBtu $1.99
TOTAL ENERGY COSTS $344,021
RECOMMENDED SAVINGS* $66,928 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,205
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,233
Cost:
$8,800
$9,233 138,921 - - $9,233
138,921
kWh
-
-
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$505
Cost:
$526
- - $505 253 -
-
kWh
$505
253
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,645
Cost:
-
$1,645 29,308 - - $1,645
29,308
kWh
-
-
MMBtu
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$9,581
Cost:
$2,618
- - $9,581 4,805 -
-
kWh
$9,581
4,805
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,652
Cost:
$832
- - $1,652 829 -
-
kWh
$1,652
829
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$815
Cost:
$2,199
$815 4,689 - - $815
4,689
kWh
-
-
MMBtu
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$43,497
Cost:
$198,000
$43,497 567,116 - - $43,497
567,116
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$66,928
Cost:
$212,975
$55,190 740,034 $11,738 5,887 $55,190
740,034
kWh
$11,738
5,887
MMBtu
TOTAL IMPLEMENTED Savings:
$12,205
Cost:
$12,357
$10,048 143,610 $2,157 1,082 $10,048
143,610
kWh
$2,157
1,082
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas