IAC logo
IAC Assessment: OK0457
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0457
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1995
Principal Product Canned vegetables
NAICS n/a
SIC 2033 - Canned Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 73
Plant Area (Sq.Ft.) 275,000
Annual Production 2,000,000 Pieces
Production Hrs. Annual 2,600
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $101,302 1,388,921 kWh $0.07
Natural Gas $84,316 41,975 MMBtu $2.01
TOTAL ENERGY COSTS $185,618
RECOMMENDED SAVINGS* $15,366 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,248
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,236
Cost:
$13,720
$8,198 112,251 $(-962) (-479) $8,198
112,251
kWh
$(-962)
(-479)
MMBtu
02: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$2,691
Cost:
$64
- - $2,691 1,451 -
-
kWh
$2,691
1,451
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,741
Cost:
$4,508
- - $1,741 867 -
-
kWh
$1,741
867
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,344
Cost:
$3,612
- - $1,344 669 -
-
kWh
$1,344
669
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,224
Cost:
$2,077
$1,224 16,706 - - $1,224
16,706
kWh
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$882
Cost:
$2,480
- - $882 439 -
-
kWh
$882
439
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$199
Cost:
$240
$199 2,638 - - $199
2,638
kWh
-
-
MMBtu
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$49
Cost:
$76
$49 586 - - $49
586
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$15,366
Cost:
$26,777
$9,670 132,181 $5,696 2,947 $9,670
132,181
kWh
$5,696
2,947
MMBtu
TOTAL IMPLEMENTED Savings:
$7,248
Cost:
$10,577
$1,472 19,930 $5,776 2,987 $1,472
19,930
kWh
$5,776
2,987
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas