IAC Assessment: OK0485
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0485
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1996
Principal Product Printed Materials
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $5,000,000-$10,000,000
# of Employees 47
Plant Area (Sq.Ft.) 45,000
Annual Production 2,300,000 Pounds
Production Hrs. Annual 4,810
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $54,853 1,018,464 kWh $0.05
Natural Gas $12,519 2,239 MMBtu $5.59
TOTAL ENERGY COSTS $98,467
RECOMMENDED SAVINGS* $19,470 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,225
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)
$ kWh $ MMBtu $ lb
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$10,114
Cost:
$23,322
$19,382 363,716 $(-9,268) (-1,655) - - $19,382
363,716
kWh
$(-9,268)
(-1,655)
MMBtu
-
-
lb
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$1,827
Cost:
$2,730
$1,827 34,291 - - - - $1,827
34,291
kWh
-
-
MMBtu
-
-
lb
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$428
Cost:
$786
$428 7,913 - - - - $428
7,913
kWh
-
-
MMBtu
-
-
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$131
Cost:
$395
$131 2,345 - - - - $131
2,345
kWh
-
-
MMBtu
-
-
lb
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$6,970
Cost:
$29,500
- - - - $6,970 - -
-
kWh
-
-
MMBtu
$6,970
-
lb
TOTAL RECOMMENDED Savings:
$19,470
Cost:
$56,733
$21,768 408,265 $(-9,268) (-1,655) $6,970 - $21,768
408,265
kWh
$(-9,268)
(-1,655)
MMBtu
$6,970
-
lb
TOTAL IMPLEMENTED Savings:
$9,225
Cost:
$33,016
$2,255 42,204 - - $6,970 - $2,255
42,204
kWh
-
-
MMBtu
$6,970
-
lb
Savings
Cost
$ kWh $ MMBtu $ lb
Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)