IAC logo
IAC Assessment: OK0490
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0490
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1996
Principal Product Oilfield chemicals
NAICS n/a
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 55,000
Annual Production 1,680 Thousand Gallons
Production Hrs. Annual 2,080
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $39,802 1,793,376 kWh $0.02
Electricity Demand $37,835 6,117 kW-months/year $6.19
Electricity Fees $1,795 - $ -
Natural Gas $135,099 44,358 MMBtu $3.05
TOTAL ENERGY COSTS $225,374
RECOMMENDED SAVINGS* $35,670 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,992
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,884
Cost:
$9,000
- - - - $4,884 1,117 - - -
-
kWh
-
-
kW-months/year
$4,884
1,117
MMBtu
-
-
Tgal
02: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$29,136
Cost:
$12,600
- - - - $26,145 5,980 $2,991 1,877,000 -
-
kWh
-
-
kW-months/year
$26,145
5,980
MMBtu
$2,991
1,877,000
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$952
Cost:
$4,125
$455 12,016 $497 69 - - - - $455
12,016
kWh
$497
69
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 3.4155 METER WASTE WATER Savings:
$678
Cost:
$1,800
- - - - - - $678 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$678
-
Tgal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$20
Cost:
$50
$20 1,758 - - - - - - $20
1,758
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$35,670
Cost:
$27,575
$475 13,774 $497 69 $31,029 7,097 $3,669 1,877,000 $475
13,774
kWh
$497
69
kW-months/year
$31,029
7,097
MMBtu
$3,669
1,877,000
Tgal
TOTAL IMPLEMENTED Savings:
$34,992
Cost:
$25,775
$475 13,774 $497 69 $31,029 7,097 $2,991 1,877,000 $475
13,774
kWh
$497
69
kW-months/year
$31,029
7,097
MMBtu
$2,991
1,877,000
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal