Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 1996 |
Principal Product | Prestressed concrete and concrete pipes |
NAICS | n/a |
SIC | 3272 - Concrete Products, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 30,000 |
Annual Production | 30,000 Tons |
Production Hrs. Annual | 2,080 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $33,553 | 691,383 | kWh | $0.05 |
Electricity Demand | $368 | 3,502 | kW-months/year | $0.11 |
Electricity Fees | $2,748 | - | $ | - |
Natural Gas | $48,176 | 14,516 | MMBtu | $3.32 |
Other Energy | $16,324 | 1,956 | MMBtu | $8.35 |
TOTAL ENERGY COSTS | $101,664 | |||
RECOMMENDED SAVINGS* | $28,953 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $17,772 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Energy | Other Liquid (haz) | Electricity Usage | Natural Gas | Other Energy | Other Liquid (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.6124 BURN WASTE OIL FOR HEAT |
Savings: $1,349 Cost: $2,995 |
- | - | $854 | 257 | - | - | $495 | 990 |
- - kWh |
$854 257 MMBtu |
- - MMBtu |
$495 990 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,329 Cost: $30 |
$4,329 | 347,304 | - | - | - | - | - | - |
$4,329 347,304 kWh |
- - MMBtu |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $12,771 Cost: $37,950 |
- | - | $12,771 | 3,848 | - | - | - | - |
- - kWh |
$12,771 3,848 MMBtu |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1335 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS |
Savings: $9,832 Cost: $27,000 |
- | - | $(-6,492) | (-1,956) | $16,324 | 1,956 | - | - |
- - kWh |
$(-6,492) (-1,956) MMBtu |
$16,324 1,956 MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $329 Cost: $655 |
$329 | 6,155 | - | - | - | - | - | - |
$329 6,155 kWh |
- - MMBtu |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $234 Cost: $400 |
$328 | 6,155 | $(-94) | (-28) | - | - | - | - |
$328 6,155 kWh |
$(-94) (-28) MMBtu |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $109 Cost: $62 |
- | - | $109 | 33 | - | - | - | - |
- - kWh |
$109 33 MMBtu |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $28,953 Cost: $69,092 |
$4,986 | 359,614 | $7,148 | 2,154 | $16,324 | 1,956 | $495 | 990 | $4,986 359,614 kWh |
$7,148 2,154 MMBtu |
$16,324 1,956 MMBtu |
$495 990 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $17,772 Cost: $39,097 |
$4,986 | 359,614 | $12,786 | 3,853 | - | - | - | - | $4,986 359,614 kWh |
$12,786 3,853 MMBtu |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Energy | Other Liquid (haz) | Electricity Usage | Natural Gas | Other Energy | Other Liquid (haz) |