IAC logo
IAC Assessment: OK0491
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0491
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1996
Principal Product Prestressed concrete and concrete pipes
NAICS n/a
SIC 3272 - Concrete Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 30,000
Annual Production 30,000 Tons
Production Hrs. Annual 2,080
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $33,553 691,383 kWh $0.05
Electricity Demand $368 3,502 kW-months/year $0.11
Electricity Fees $2,748 - $ -
Natural Gas $48,176 14,516 MMBtu $3.32
Other Energy $16,324 1,956 MMBtu $8.35
TOTAL ENERGY COSTS $101,664
RECOMMENDED SAVINGS* $28,953 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,772
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Other Liquid (haz) Electricity Usage Natural Gas Other Energy Other Liquid (haz)
$ kWh $ MMBtu $ MMBtu $ gal
01: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$1,349
Cost:
$2,995
- - $854 257 - - $495 990 -
-
kWh
$854
257
MMBtu
-
-
MMBtu
$495
990
gal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,329
Cost:
$30
$4,329 347,304 - - - - - - $4,329
347,304
kWh
-
-
MMBtu
-
-
MMBtu
-
-
gal
03: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$12,771
Cost:
$37,950
- - $12,771 3,848 - - - - -
-
kWh
$12,771
3,848
MMBtu
-
-
MMBtu
-
-
gal
04: 2.1335 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS Savings:
$9,832
Cost:
$27,000
- - $(-6,492) (-1,956) $16,324 1,956 - - -
-
kWh
$(-6,492)
(-1,956)
MMBtu
$16,324
1,956
MMBtu
-
-
gal
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$329
Cost:
$655
$329 6,155 - - - - - - $329
6,155
kWh
-
-
MMBtu
-
-
MMBtu
-
-
gal
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$234
Cost:
$400
$328 6,155 $(-94) (-28) - - - - $328
6,155
kWh
$(-94)
(-28)
MMBtu
-
-
MMBtu
-
-
gal
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$109
Cost:
$62
- - $109 33 - - - - -
-
kWh
$109
33
MMBtu
-
-
MMBtu
-
-
gal
TOTAL RECOMMENDED Savings:
$28,953
Cost:
$69,092
$4,986 359,614 $7,148 2,154 $16,324 1,956 $495 990 $4,986
359,614
kWh
$7,148
2,154
MMBtu
$16,324
1,956
MMBtu
$495
990
gal
TOTAL IMPLEMENTED Savings:
$17,772
Cost:
$39,097
$4,986 359,614 $12,786 3,853 - - - - $4,986
359,614
kWh
$12,786
3,853
MMBtu
-
-
MMBtu
-
-
gal
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ gal
Electricity Usage Natural Gas Other Energy Other Liquid (haz) Electricity Usage Natural Gas Other Energy Other Liquid (haz)