IAC logo
IAC Assessment: OK0493
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0493
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1996
Principal Product Gas cogeneration, Turbine inlets and exhausts
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 700,000
Annual Production 44,000,000 Pieces
Production Hrs. Annual 2,210
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $170,139 3,844,666 kWh $0.04
Electricity Demand $85,432 12,447 kW-months/year $6.86
Electricity Fees $13,795 - $ -
Natural Gas $63,661 19,347 MMBtu $3.29
TOTAL ENERGY COSTS $360,767
RECOMMENDED SAVINGS* $9,626 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,679
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (haz)
$ kWh $ kW-months/year $ MMBtu $ gal
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$92
Cost:
$100
$92 3,224 - - - - - - $92
3,224
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$237
Cost:
$90
$237 7,913 - - - - - - $237
7,913
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,380
Cost:
$1,416
$1,034 35,170 $346 48 - - - - $1,034
35,170
kWh
$346
48
kW-months/year
-
-
MMBtu
-
-
gal
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,474
Cost:
$277
- - - - $1,474 428 - - -
-
kWh
-
-
kW-months/year
$1,474
428
MMBtu
-
-
gal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$143
Cost:
$321
$107 3,517 $36 5 - - - - $107
3,517
kWh
$36
5
kW-months/year
-
-
MMBtu
-
-
gal
06: 3.8143 RECYCLE CLEANING SOLVENT AND REUSE Savings:
$6,123
Cost:
$500
- - - - - - $6,123 5,313 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,123
5,313
gal
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$64
Cost:
$60
$64 2,052 - - - - - - $64
2,052
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$113
Cost:
$336
$113 4,103 - - - - - - $113
4,103
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
TOTAL RECOMMENDED Savings:
$9,626
Cost:
$3,100
$1,647 55,979 $382 53 $1,474 428 $6,123 5,313 $1,647
55,979
kWh
$382
53
kW-months/year
$1,474
428
MMBtu
$6,123
5,313
gal
TOTAL IMPLEMENTED Savings:
$1,679
Cost:
$1,897
$1,297 43,963 $382 53 - - - - $1,297
43,963
kWh
$382
53
kW-months/year
-
-
MMBtu
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (haz)