IAC logo
IAC Assessment: OK0498
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0498
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1996
Principal Product Refurbished jet engine parts and manufacturing new engines
NAICS n/a
SIC 3721 - Aircraft
Sales $10,000,000-$50,000,000
# of Employees 690
Plant Area (Sq.Ft.) 703,000
Annual Production 800 Pieces
Production Hrs. Annual 7,488
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $920,195 21,164,420 kWh $0.04
Electricity Demand $489,693 47,031 kW-months/year $10.41
Natural Gas $188,893 41,582 MMBtu $4.54
TOTAL ENERGY COSTS $1,611,391
RECOMMENDED SAVINGS* $52,166 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,397
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz)
$ kWh $ kW-months/year $ MMBtu $ gal
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,692
Cost:
$3,200
- - - - $2,692 593 - - -
-
kWh
-
-
kW-months/year
$2,692
593
MMBtu
-
-
gal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,469
Cost:
$1,648
$1,294 12,309 $175 17 - - - - $1,294
12,309
kWh
$175
17
kW-months/year
-
-
MMBtu
-
-
gal
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,649
Cost:
$1,399
- - - - $4,649 1,024 - - -
-
kWh
-
-
kW-months/year
$4,649
1,024
MMBtu
-
-
gal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,295
Cost:
$4,770
$1,657 38,101 $638 61 - - - - $1,657
38,101
kWh
$638
61
kW-months/year
-
-
MMBtu
-
-
gal
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$120
Cost:
$366
$120 2,638 - - - - - - $120
2,638
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,199
Cost:
$23,287
$12,421 286,342 $4,778 459 - - - - $12,421
286,342
kWh
$4,778
459
kW-months/year
-
-
MMBtu
-
-
gal
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,160
Cost:
$4,844
$1,560 36,049 $600 58 - - - - $1,560
36,049
kWh
$600
58
kW-months/year
-
-
MMBtu
-
-
gal
08: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$21,582
Cost:
$4,500
- - - - - - $21,582 2,614 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$21,582
2,614
gal
TOTAL RECOMMENDED Savings:
$52,166
Cost:
$44,014
$17,052 375,439 $6,191 595 $7,341 1,617 $21,582 2,614 $17,052
375,439
kWh
$6,191
595
kW-months/year
$7,341
1,617
MMBtu
$21,582
2,614
gal
TOTAL IMPLEMENTED Savings:
$47,397
Cost:
$42,249
$16,932 372,801 $6,191 595 $2,692 593 $21,582 2,614 $16,932
372,801
kWh
$6,191
595
kW-months/year
$2,692
593
MMBtu
$21,582
2,614
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal