IAC logo
IAC Assessment: OK0499
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0499
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1996
Principal Product Livestock Feeds
NAICS n/a
SIC 2048 - Prepared Feeds, Nec
Sales $5,000,000-$10,000,000
# of Employees 26
Plant Area (Sq.Ft.) 25,000
Annual Production 51,000 Tons
Production Hrs. Annual 4,160
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $90,004 1,771,102 kWh $0.05
Electricity Demand $1,301 7,290 kW-months/year $0.18
Electricity Fees $1,866 - $ -
Natural Gas $93,170 10,888 MMBtu $8.56
TOTAL ENERGY COSTS $188,011
RECOMMENDED SAVINGS* $9,237 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,063
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,063
Cost:
$1,976
$3,188 58,617 $875 150 - - - - $3,188
58,617
kWh
$875
150
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,262
Cost:
$2,915
- - - - $1,262 295 - - -
-
kWh
-
-
kW-months/year
$1,262
295
MMBtu
-
-
lb
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,084
Cost:
$5,000
- - - - $3,084 402 - - -
-
kWh
-
-
kW-months/year
$3,084
402
MMBtu
-
-
lb
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$100
Cost:
$160
$100 1,172 - - - - - - $100
1,172
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$308
Cost:
$156
- - - - $308 120 - - -
-
kWh
-
-
kW-months/year
$308
120
MMBtu
-
-
lb
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$420
Cost:
-
- - - - - - $420 7,200 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$420
7,200
lb
TOTAL RECOMMENDED Savings:
$9,237
Cost:
$10,207
$3,288 59,789 $875 150 $4,654 817 $420 7,200 $3,288
59,789
kWh
$875
150
kW-months/year
$4,654
817
MMBtu
$420
7,200
lb
TOTAL IMPLEMENTED Savings:
$4,063
Cost:
$1,976
$3,188 58,617 $875 150 - - - - $3,188
58,617
kWh
$875
150
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)