IAC logo
IAC Assessment: OK0500
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0500
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1996
Principal Product Pipe Coatings
NAICS n/a
SIC 3479 - Metal Coating And Allied Services
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 25,000
Annual Production 30,000 Tons
Production Hrs. Annual 2,860
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $117,102 2,272,274 kWh $0.05
Electricity Demand $1,232 22,129 kW-months/year $0.06
Electricity Fees $600 - $ -
Natural Gas $29,523 7,608 MMBtu $3.88
TOTAL ENERGY COSTS $211,977
RECOMMENDED SAVINGS* $11,196 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,578
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ MMBtu $ lb $ $
01: 3.8314 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS Savings:
$6,013
Cost:
-
- - - - $1,437 19,162 $4,576 - -
-
kWh
-
-
MMBtu
$1,437
19,162
lb
$4,576
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,222
Cost:
$11,250
$3,222 60,961 - - - - - - $3,222
60,961
kWh
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,125
Cost:
$620
- - $1,125 290 - - - - -
-
kWh
$1,125
290
MMBtu
-
-
lb
-
-
$
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$420
Cost:
$1,300
$420 7,913 - - - - - - $420
7,913
kWh
-
-
MMBtu
-
-
lb
-
-
$
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$396
Cost:
$35
$396 7,620 - - - - - - $396
7,620
kWh
-
-
MMBtu
-
-
lb
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$20
Cost:
$30
$20 1,465 - - - - - - $20
1,465
kWh
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$11,196
Cost:
$13,235
$4,058 77,959 $1,125 290 $1,437 19,162 $4,576 - $4,058
77,959
kWh
$1,125
290
MMBtu
$1,437
19,162
lb
$4,576
-
$
TOTAL IMPLEMENTED Savings:
$7,578
Cost:
$1,950
$440 9,378 $1,125 290 $1,437 19,162 $4,576 - $440
9,378
kWh
$1,125
290
MMBtu
$1,437
19,162
lb
$4,576
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes