IAC logo
IAC Assessment: OK0503
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0503
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1996
Principal Product Custom injection molding
NAICS n/a
SIC 3079 -
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 129,000
Annual Production 24,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $241,530 13,185,815 kWh $0.02
Electricity Demand $114,348 27,428 kW-months/year $4.17
Electricity Fees $38,293 - $ -
Natural Gas $17,491 4,623 MMBtu $3.78
TOTAL ENERGY COSTS $422,846
RECOMMENDED SAVINGS* $22,643 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,019
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Electricity Usage Electricity Demand Other Liquid (haz)
$ kWh $ kW-months/year $ gal
01: 3.3126 USE ABSORPTION, EXTRACTION TO REMOVE CONTAMINANTS Savings:
$9,419
Cost:
$800
- - - - $9,419 751 -
-
kWh
-
-
kW-months/year
$9,419
751
gal
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,600
Cost:
-
- - $2,600 88 - - -
-
kWh
$2,600
88
kW-months/year
-
-
gal
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,819
Cost:
$10,000
$2,017 85,287 $802 44 - - $2,017
85,287
kWh
$802
44
kW-months/year
-
-
gal
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,213
Cost:
$20,000
$2,346 99,355 $1,867 383 - - $2,346
99,355
kWh
$1,867
383
kW-months/year
-
-
gal
05: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$3,592
Cost:
$54,000
$3,592 152,110 - - - - $3,592
152,110
kWh
-
-
kW-months/year
-
-
gal
TOTAL RECOMMENDED Savings:
$22,643
Cost:
$84,800
$7,955 336,752 $5,269 515 $9,419 751 $7,955
336,752
kWh
$5,269
515
kW-months/year
$9,419
751
gal
TOTAL IMPLEMENTED Savings:
$12,019
Cost:
$800
- - $2,600 88 $9,419 751 -
-
kWh
$2,600
88
kW-months/year
$9,419
751
gal
Savings
Cost
$ kWh $ kW-months/year $ gal
Electricity Usage Electricity Demand Other Liquid (haz) Electricity Usage Electricity Demand Other Liquid (haz)