IAC Assessment: OK0506
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0506
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1996
Principal Product Animal Feeds
NAICS n/a
SIC 2048 - Prepared Feeds, Nec
Sales $5,000,000-$10,000,000
# of Employees 25
Plant Area (Sq.Ft.) 45,000
Annual Production 35,000 Tons
Production Hrs. Annual 3,120
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $82,252 1,584,701 kWh $0.05
Electricity Fees $2,780 - $ -
Natural Gas $23,392 6,897 MMBtu $3.39
TOTAL ENERGY COSTS $112,336
RECOMMENDED SAVINGS* $3,331 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,801
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)
$ kWh $ MMBtu $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$820
Cost:
$2,304
$820 20,223 - - - - $820
20,223
kWh
-
-
MMBtu
-
-
lb
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$104
Cost:
$126
- - $104 36 - - -
-
kWh
$104
36
MMBtu
-
-
lb
03: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$705
Cost:
$100
- - $705 244 - - -
-
kWh
$705
244
MMBtu
-
-
lb
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,449
Cost:
$4,180
- - - - $1,449 3,900 -
-
kWh
-
-
MMBtu
$1,449
3,900
lb
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$172
Cost:
$60
$172 2,931 - - - - $172
2,931
kWh
-
-
MMBtu
-
-
lb
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$81
Cost:
$168
- - $81 28 - - -
-
kWh
$81
28
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$3,331
Cost:
$6,938
$992 23,154 $890 308 $1,449 3,900 $992
23,154
kWh
$890
308
MMBtu
$1,449
3,900
lb
TOTAL IMPLEMENTED Savings:
$1,801
Cost:
$2,590
$992 23,154 $809 280 - - $992
23,154
kWh
$809
280
MMBtu
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ lb
Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)