IAC logo
IAC Assessment: OK0507
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0507
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1996
Principal Product Wheat Flour
NAICS n/a
SIC 2048 - Prepared Feeds, Nec
Sales $50,000,000-$100,000,000
# of Employees 70
Plant Area (Sq.Ft.) 249,840
Annual Production 200,000 Tons
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $518,553 21,936,108 kWh $0.02
Electricity Demand $331,499 43,100 kW-months/year $7.69
Electricity Fees $3,228 - $ -
Natural Gas $7,228 1,499 MMBtu $4.82
TOTAL ENERGY COSTS $1,513,406
RECOMMENDED SAVINGS* $36,944 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,282
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz)
$ kWh $ kW-months/year $ Tgal $ lb
01: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$800
Cost:
-
- - - - - - $800 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$800
-
lb
02: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$18,853
Cost:
-
- - - - $18,853 - - - -
-
kWh
-
-
kW-months/year
$18,853
-
Tgal
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,725
Cost:
$8,750
$3,784 157,679 $1,941 216 - - - - $3,784
157,679
kWh
$1,941
216
kW-months/year
-
-
Tgal
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,744
Cost:
$390
$7,744 322,685 - - - - - - $7,744
322,685
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,538
Cost:
$7,860
$2,538 105,803 - - - - - - $2,538
105,803
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$873
Cost:
$1,890
$873 36,342 - - - - - - $873
36,342
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$411
Cost:
$2,244
$411 17,292 - - - - - - $411
17,292
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
TOTAL RECOMMENDED Savings:
$36,944
Cost:
$21,134
$15,350 639,801 $1,941 216 $18,853 - $800 - $15,350
639,801
kWh
$1,941
216
kW-months/year
$18,853
-
Tgal
$800
-
lb
TOTAL IMPLEMENTED Savings:
$10,282
Cost:
$8,250
$10,282 428,488 - - - - - - $10,282
428,488
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb