IAC logo
IAC Assessment: OK0510
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0510
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1996
Principal Product Cottonseed Oil, Meal, Lint, Hulls
NAICS n/a
SIC 2074 - Cottonseed Oil Mills
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 0
Annual Production 77,000 Pieces
Production Hrs. Annual 8,046
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $372,161 9,950,762 kWh $0.04
Electricity Demand $34,594 17,424 kW-months/year $1.99
Electricity Fees $10,283 - $ -
Natural Gas $602,401 112,066 MMBtu $5.38
TOTAL ENERGY COSTS $1,046,479
RECOMMENDED SAVINGS* $38,125 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)
$ kWh $ MMBtu $ lb
01: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$16,000
Cost:
$7,960
- - - - $16,000 80,000 -
-
kWh
-
-
MMBtu
$16,000
80,000
lb
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$37
Cost:
$25
- - $37 17 - - -
-
kWh
$37
17
MMBtu
-
-
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,445
Cost:
$588
$9,445 295,135 - - - - $9,445
295,135
kWh
-
-
MMBtu
-
-
lb
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$12,303
Cost:
-
$12,303 384,525 - - - - $12,303
384,525
kWh
-
-
MMBtu
-
-
lb
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$340
Cost:
$113
$340 10,551 - - - - $340
10,551
kWh
-
-
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$38,125
Cost:
$8,686
$22,088 690,211 $37 17 $16,000 80,000 $22,088
690,211
kWh
$37
17
MMBtu
$16,000
80,000
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ lb
Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)