IAC Assessment: OK0512
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0512
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1996
Principal Product Commercial Air Conditioners
NAICS n/a
SIC 3585 - Refrigeration And Heating Equipment
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 60,000
Annual Production 10,000 Pieces
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,485 1,757,034 kWh $0.02
Electricity Demand $41,739 4,366 kW-months/year $9.56
Electricity Fees $(-4,410) - $ -
Natural Gas $21,162 5,501 MMBtu $3.85
TOTAL ENERGY COSTS $115,400
RECOMMENDED SAVINGS* $9,863 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,639
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,028
Cost:
$16,512
$2,075 115,768 $1,953 204 - - - - $2,075
115,768
kWh
$1,953
204
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,224
Cost:
$2,052
$895 49,824 $2,753 288 $(-424) (-60) - - $895
49,824
kWh
$2,753
288
kW-months/year
$(-424)
(-60)
MMBtu
-
-
lb
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$819
Cost:
-
$819 45,721 - - - - - - $819
45,721
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$689
Cost:
$620
- - - - $689 179 - - -
-
kWh
-
-
kW-months/year
$689
179
MMBtu
-
-
lb
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$497
Cost:
$528
$497 27,843 - - - - - - $497
27,843
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$106
Cost:
$494
$66 3,810 $40 5 - - - - $66
3,810
kWh
$40
5
kW-months/year
-
-
MMBtu
-
-
lb
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$500
Cost:
-
- - - - - - $500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$500
-
lb
TOTAL RECOMMENDED Savings:
$9,863
Cost:
$20,206
$4,352 242,966 $4,746 497 $265 119 $500 - $4,352
242,966
kWh
$4,746
497
kW-months/year
$265
119
MMBtu
$500
-
lb
TOTAL IMPLEMENTED Savings:
$6,639
Cost:
$18,154
$3,457 193,142 $1,993 209 $689 179 $500 - $3,457
193,142
kWh
$1,993
209
kW-months/year
$689
179
MMBtu
$500
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)