IAC Assessment: OK0514
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0514
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1997
Principal Product Jeans
NAICS n/a
SIC 2325 - Men's and Boys' Separate Trousers and Slacks
Sales $5,000,000-$10,000,000
# of Employees 200
Plant Area (Sq.Ft.) 26,000
Annual Production 3,500,000 Pieces
Production Hrs. Annual 2,080
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $34,342 897,714 kWh $0.04
Electricity Demand $18,180 2,975 kW-months/year $6.11
Electricity Fees $1,968 - $ -
Natural Gas $2,191 444 MMBtu $4.93
TOTAL ENERGY COSTS $62,681
RECOMMENDED SAVINGS* $14,333 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,114
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$6,500
Cost:
$28,000
- - - - - - $6,500 - -
-
kWh
-
-
kW-months/year
-
-
lb
$6,500
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,418
Cost:
$22,989
$1,762 46,014 $1,656 265 - - - - $1,762
46,014
kWh
$1,656
265
kW-months/year
-
-
lb
-
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,589
Cost:
-
$1,589 41,618 - - - - - - $1,589
41,618
kWh
-
-
kW-months/year
-
-
lb
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$199
Cost:
$660
$199 5,275 - - - - - - $199
5,275
kWh
-
-
kW-months/year
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$69
Cost:
$237
$56 1,465 $13 2 - - - - $56
1,465
kWh
$13
2
kW-months/year
-
-
lb
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$38
Cost:
$50
$38 1,758 - - - - - - $38
1,758
kWh
-
-
kW-months/year
-
-
lb
-
-
$
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$600
Cost:
-
- - - - $600 - - - -
-
kWh
-
-
kW-months/year
$600
-
lb
-
-
$
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$1,920
Cost:
$21,354
- - - - $1,920 - - - -
-
kWh
-
-
kW-months/year
$1,920
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$14,333
Cost:
$73,290
$3,644 96,130 $1,669 267 $2,520 - $6,500 - $3,644
96,130
kWh
$1,669
267
kW-months/year
$2,520
-
lb
$6,500
-
$
TOTAL IMPLEMENTED Savings:
$5,114
Cost:
$23,276
$3,445 90,855 $1,669 267 - - - - $3,445
90,855
kWh
$1,669
267
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes