IAC Assessment: OK0517
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0517
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1997
Principal Product Cathodic Protection
NAICS n/a
SIC 3354 - Aluminum Extruded Products
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 200,000
Annual Production 6,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $119,321 2,503,810 kWh $0.05
Electricity Fees $982 - $ -
Natural Gas $132,524 48,055 MMBtu $2.76
TOTAL ENERGY COSTS $338,519
RECOMMENDED SAVINGS* $146,742 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $140,932
#|Description Savings
Cost
Status Electricity Usage Other Liquid (non-haz) Personnel Changes Electricity Usage Other Liquid (non-haz) Personnel Changes
$ kWh $ gal $ $
01: 4.1120 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$124,800
Cost:
$150,000
- - - - $124,800 - -
-
kWh
-
-
gal
$124,800
-
$
02: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$15,653
Cost:
$36,725
$(-2,574) (-65,064) $18,227 11,155,000 - - $(-2,574)
(-65,064)
kWh
$18,227
11,155,000
gal
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,810
Cost:
$5,000
$5,810 147,128 - - - - $5,810
147,128
kWh
-
-
gal
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$434
Cost:
$1,872
$434 11,137 - - - - $434
11,137
kWh
-
-
gal
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$45
Cost:
$40
$45 2,345 - - - - $45
2,345
kWh
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$146,742
Cost:
$193,637
$3,715 95,546 $18,227 11,155,000 $124,800 - $3,715
95,546
kWh
$18,227
11,155,000
gal
$124,800
-
$
TOTAL IMPLEMENTED Savings:
$140,932
Cost:
$188,637
$(-2,095) (-51,582) $18,227 11,155,000 $124,800 - $(-2,095)
(-51,582)
kWh
$18,227
11,155,000
gal
$124,800
-
$
Savings
Cost
$ kWh $ gal $ $
Electricity Usage Other Liquid (non-haz) Personnel Changes Electricity Usage Other Liquid (non-haz) Personnel Changes