IAC logo
IAC Assessment: OK0518
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0518
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1997
Principal Product Cut up poultry
NAICS n/a
SIC 2013 - Sausages And Other Prepared Meats
Sales $50,000,000-$100,000,000
# of Employees 1,100
Plant Area (Sq.Ft.) 165,000
Annual Production 265,000,000 Pounds
Production Hrs. Annual 8,520
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $725,521 28,991,794 kWh $0.03
Electricity Demand $200,187 24,360 kW-months/year $8.22
Natural Gas $279,016 92,263 MMBtu $3.02
TOTAL ENERGY COSTS $(-1,800,450)
RECOMMENDED SAVINGS* $70,561 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,289
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,774
Cost:
$17,415
$2,567 102,579 $1,294 321 - - - - $(-87) - $2,567
102,579
kWh
$1,294
321
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-87)
-
$
02: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$7,965
Cost:
$5,000
- - - - $7,965 2,634 - - - - -
-
kWh
-
-
kW-months/year
$7,965
2,634
MMBtu
-
-
Tgal
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$6,577
Cost:
$8,566
- - - - $6,577 2,175 - - - - -
-
kWh
-
-
kW-months/year
$6,577
2,175
MMBtu
-
-
Tgal
-
-
$
04: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$3,330
Cost:
-
- - - - - - - - $3,330 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$3,330
-
$
05: 3.4151 MINIMIZE WATER USAGE Savings:
$47,695
Cost:
$7,520
- - - - - - $47,695 51,120,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$47,695
51,120,000
Tgal
-
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,220
Cost:
$2,561
$2,194 87,632 - - $(-974) (-322) - - - - $2,194
87,632
kWh
-
-
kW-months/year
$(-974)
(-322)
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$70,561
Cost:
$41,062
$4,761 190,211 $1,294 321 $13,568 4,487 $47,695 51,120,000 $3,243 - $4,761
190,211
kWh
$1,294
321
kW-months/year
$13,568
4,487
MMBtu
$47,695
51,120,000
Tgal
$3,243
-
$
TOTAL IMPLEMENTED Savings:
$16,289
Cost:
$24,976
$4,761 190,211 $1,294 321 $6,991 2,312 - - $3,243 - $4,761
190,211
kWh
$1,294
321
kW-months/year
$6,991
2,312
MMBtu
-
-
Tgal
$3,243
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes