Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 1997 |
Principal Product | Baby food |
NAICS | n/a |
SIC | 2032 - Canned Specialties |
Sales | $100,000,000-$500,000,000 |
# of Employees | 490 |
Plant Area (Sq.Ft.) | 1,200,000 |
Annual Production | 480,000,000 Pieces |
Production Hrs. Annual | 4,576 |
Location (State) | AR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $492,219 | 25,814,479 | kWh | $0.02 |
Electricity Demand | $220,167 | 53,477 | kW-months/year | $4.12 |
Electricity Fees | $2,520 | - | $ | - |
Natural Gas | $1,225,268 | 424,347 | MMBtu | $2.89 |
TOTAL ENERGY COSTS | $2,421,424 | |||
RECOMMENDED SAVINGS* | $212,840 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $212,840 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS |
Savings: $178,301 Cost: $18,000 |
- | - | - | - | $178,301 | 62,061 | - | - | - | - |
- - kWh |
- - kW-months/year |
$178,301 62,061 MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,853 Cost: $15,000 |
$3,853 | 163,247 | - | - | - | - | - | - | - | - |
$3,853 163,247 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $4,927 Cost: - |
- | - | - | - | $4,927 | 1,715 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,927 1,715 MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.1227 USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) |
Savings: $14,177 Cost: $20,000 |
- | - | - | - | - | - | $14,177 | 10,394,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$14,177 10,394,000 Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES |
Savings: - Cost: $119,800 |
- | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.3113 USE OTHER METHODS FOR NEUTRALIZATION |
Savings: $11,000 Cost: $50,000 |
- | - | - | - | - | - | - | - | $11,000 | 3,000,000 |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$11,000 3,000,000 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $467 Cost: $880 |
$467 | 19,637 | - | - | - | - | - | - | - | - |
$467 19,637 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $115 Cost: $644 |
$93 | 3,810 | $22 | 5 | - | - | - | - | - | - |
$93 3,810 kWh |
$22 5 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $212,840 Cost: $224,324 |
$4,413 | 186,694 | $22 | 5 | $183,228 | 63,776 | $14,177 | 10,394,000 | $11,000 | 3,000,000 | $4,413 186,694 kWh |
$22 5 kW-months/year |
$183,228 63,776 MMBtu |
$14,177 10,394,000 Tgal |
$11,000 3,000,000 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $212,840 Cost: $104,524 |
$4,413 | 186,694 | $22 | 5 | $183,228 | 63,776 | $14,177 | 10,394,000 | $11,000 | 3,000,000 | $4,413 186,694 kWh |
$22 5 kW-months/year |
$183,228 63,776 MMBtu |
$14,177 10,394,000 Tgal |
$11,000 3,000,000 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) |