IAC logo
IAC Assessment: OK0520
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0520
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1997
Principal Product Electrical submersible pumps
NAICS n/a
SIC 3561 - Pumps And Pumping Equipment
Sales $100,000,000-$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 110,000
Annual Production 1,500 Pieces
Production Hrs. Annual 4,940
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,750 2,400,352 kWh $0.02
Electricity Demand $70,645 6,954 kW-months/year $10.16
Electricity Fees $931 - $ -
Natural Gas $22,616 5,585 MMBtu $4.05
TOTAL ENERGY COSTS $218,676
RECOMMENDED SAVINGS* $50,103 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,550
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
01: 3.3125 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS Savings:
$16,641
Cost:
$12,000
- - - - - - $16,641 177,400 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$16,641
177,400
gal
-
-
lb
-
-
$
02: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$10,940
Cost:
-
- - - - - - - - $10,940 2,035 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$10,940
2,035
lb
-
-
$
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$1,039
Cost:
$2,200
$(-39) (-1,465) - - - - $1,078 26,900 - - - - $(-39)
(-1,465)
kWh
-
-
kW-months/year
-
-
MMBtu
$1,078
26,900
gal
-
-
lb
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$795
Cost:
$522
$795 29,308 - - - - - - - - - - $795
29,308
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$657
Cost:
-
- - - - $657 210 - - - - - - -
-
kWh
-
-
kW-months/year
$657
210
MMBtu
-
-
gal
-
-
lb
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$312
Cost:
$58
$178 6,448 $134 15 - - - - - - - - $178
6,448
kWh
$134
15
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$192
Cost:
$396
$192 7,034 - - - - - - - - - - $192
7,034
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
08: 4.3110 SCHEDULE DELIVERIES ACCORDING TO DEMAND Savings:
$18,000
Cost:
-
- - - - - - - - - - $18,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$18,000
-
$
09: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$1,527
Cost:
$3,990
$(-24) (-879) - - $301 96 $1,250 550 - - - - $(-24)
(-879)
kWh
-
-
kW-months/year
$301
96
MMBtu
$1,250
550
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$50,103
Cost:
$19,166
$1,102 40,446 $134 15 $958 306 $18,969 204,850 $10,940 2,035 $18,000 - $1,102
40,446
kWh
$134
15
kW-months/year
$958
306
MMBtu
$18,969
204,850
gal
$10,940
2,035
lb
$18,000
-
$
TOTAL IMPLEMENTED Savings:
$46,550
Cost:
$12,058
$178 6,448 $134 15 $657 210 $16,641 177,400 $10,940 2,035 $18,000 - $178
6,448
kWh
$134
15
kW-months/year
$657
210
MMBtu
$16,641
177,400
gal
$10,940
2,035
lb
$18,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes