IAC logo
IAC Assessment: OK0521
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0521
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1997
Principal Product speakers/amplifiers
NAICS n/a
SIC 3651 - Household Audio And Video Equipment
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 250,000
Annual Production 360,000 Pieces
Production Hrs. Annual 2,210
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $80,276 2,604,045 kWh $0.03
Electricity Demand $64,026 7,434 kW-months/year $8.61
Natural Gas $17,599 4,806 MMBtu $3.66
TOTAL ENERGY COSTS $173,618
RECOMMENDED SAVINGS* $74,467 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 3.2176 INCREASE USE OF AUTOMATION Savings:
$66,300
Cost:
$200,000
- - - - - - - - $66,300 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$66,300
-
$
02: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$5,370
Cost:
$1,320
- - - - $(-66) (-9) $5,436 1,040 - - -
-
kWh
-
-
kW-months/year
$(-66)
(-9)
MMBtu
$5,436
1,040
gal
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,798
Cost:
$9,384
$580 22,860 $1,218 125 - - - - - - $580
22,860
kWh
$1,218
125
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
04: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$679
Cost:
$847
- - - - $679 204 - - - - -
-
kWh
-
-
kW-months/year
$679
204
MMBtu
-
-
gal
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$220
Cost:
$622
$220 8,792 - - - - - - - - $220
8,792
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$100
Cost:
$161
$100 4,103 - - - - - - - - $100
4,103
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$74,467
Cost:
$212,334
$900 35,755 $1,218 125 $613 195 $5,436 1,040 $66,300 - $900
35,755
kWh
$1,218
125
kW-months/year
$613
195
MMBtu
$5,436
1,040
gal
$66,300
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes