Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 1997 |
Principal Product | speakers/amplifiers |
NAICS | n/a |
SIC | 3651 - Household Audio And Video Equipment |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 360,000 Pieces |
Production Hrs. Annual | 2,210 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $80,276 | 2,604,045 | kWh | $0.03 |
Electricity Demand | $64,026 | 7,434 | kW-months/year | $8.61 |
Natural Gas | $17,599 | 4,806 | MMBtu | $3.66 |
TOTAL ENERGY COSTS | $173,618 | |||
RECOMMENDED SAVINGS* | $74,467 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.2176 INCREASE USE OF AUTOMATION |
Savings: $66,300 Cost: $200,000 |
- | - | - | - | - | - | - | - | $66,300 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$66,300 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE |
Savings: $5,370 Cost: $1,320 |
- | - | - | - | $(-66) | (-9) | $5,436 | 1,040 | - | - |
- - kWh |
- - kW-months/year |
$(-66) (-9) MMBtu |
$5,436 1,040 gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,798 Cost: $9,384 |
$580 | 22,860 | $1,218 | 125 | - | - | - | - | - | - |
$580 22,860 kWh |
$1,218 125 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1123 INSTALL AUTOMATIC STACK DAMPER |
Savings: $679 Cost: $847 |
- | - | - | - | $679 | 204 | - | - | - | - |
- - kWh |
- - kW-months/year |
$679 204 MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $220 Cost: $622 |
$220 | 8,792 | - | - | - | - | - | - | - | - |
$220 8,792 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $100 Cost: $161 |
$100 | 4,103 | - | - | - | - | - | - | - | - |
$100 4,103 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $74,467 Cost: $212,334 |
$900 | 35,755 | $1,218 | 125 | $613 | 195 | $5,436 | 1,040 | $66,300 | - | $900 35,755 kWh |
$1,218 125 kW-months/year |
$613 195 MMBtu |
$5,436 1,040 gal |
$66,300 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Personnel Changes |