IAC logo
IAC Assessment: OK0523
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0523
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1997
Principal Product carpet yarn
NAICS n/a
SIC 2281 - Yarn Spinning Mills
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 176,000
Annual Production 20,400,000 Pounds
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $773,980 23,067,996 kWh $0.03
Natural Gas $194,254 91,539 MMBtu $2.12
TOTAL ENERGY COSTS $1,031,394
RECOMMENDED SAVINGS* $169,161 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $142,105
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ MMBtu $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,325
Cost:
$132,000
$24,325 784,584 - - - - - - $24,325
784,584
kWh
-
-
MMBtu
-
-
lb
-
-
$
02: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$65,338
Cost:
$74,935
- - - - $58,058 - $7,280 - -
-
kWh
-
-
MMBtu
$58,058
-
lb
$7,280
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,405
Cost:
$1,188
$1,405 45,428 - - - - - - $1,405
45,428
kWh
-
-
MMBtu
-
-
lb
-
-
$
04: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$72,212
Cost:
$16,000
- - $72,212 34,030 - - - - -
-
kWh
$72,212
34,030
MMBtu
-
-
lb
-
-
$
05: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$2,478
Cost:
$6,900
- - $2,478 1,168 - - - - -
-
kWh
$2,478
1,168
MMBtu
-
-
lb
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,326
Cost:
$1,658
- - $1,326 625 - - - - -
-
kWh
$1,326
625
MMBtu
-
-
lb
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,077
Cost:
-
$2,077 67,116 - - - - - - $2,077
67,116
kWh
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$169,161
Cost:
$232,681
$27,807 897,128 $76,016 35,823 $58,058 - $7,280 - $27,807
897,128
kWh
$76,016
35,823
MMBtu
$58,058
-
lb
$7,280
-
$
TOTAL IMPLEMENTED Savings:
$142,105
Cost:
$97,835
$2,077 67,116 $74,690 35,198 $58,058 - $7,280 - $2,077
67,116
kWh
$74,690
35,198
MMBtu
$58,058
-
lb
$7,280
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Natural Gas Solid Waste (non-haz) Personnel Changes