IAC logo
IAC Assessment: OK0524
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0524
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1997
Principal Product aluminium die casts
NAICS n/a
SIC 3633 - Household Laundry Equipment
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 65,000
Annual Production 4,500,000 Pounds
Production Hrs. Annual 6,552
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $116,271 5,182,884 kWh $0.02
Electricity Demand $76,614 11,672 kW-months/year $6.56
Electricity Fees $13,697 - $ -
Natural Gas $169,087 69,971 MMBtu $2.42
TOTAL ENERGY COSTS $459,468
RECOMMENDED SAVINGS* $152,944 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Energy Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Energy Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb $ $ $ $
01: 4.452 ELIMINATE SHIFT Savings:
$86,855
Cost:
$175,000
- - - - $(-11,425) (-4,728) - - - - $98,280 - - - -
-
kWh
-
-
kW-months/year
$(-11,425)
(-4,728)
MMBtu
-
-
MMBtu
-
-
lb
$98,280
-
$
-
-
$
02: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$37,293
Cost:
$65,478
$(-1,889) (-64,185) - - $39,182 16,191 - - - - - - - - $(-1,889)
(-64,185)
kWh
-
-
kW-months/year
$39,182
16,191
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$16,057
Cost:
$65,478
$14,600 495,018 $6,566 76 $(-5,109) (-2,111) - - - - - - - - $14,600
495,018
kWh
$6,566
76
kW-months/year
$(-5,109)
(-2,111)
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,530
Cost:
$80,000
$5,895 199,590 $2,635 31 - - - - - - - - - - $5,895
199,590
kWh
$2,635
31
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,329
Cost:
$90
$1,329 45,135 - - - - - - - - - - - - $1,329
45,135
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,056
Cost:
-
- - - - - - - - $1,056 42,240 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$1,056
42,240
lb
-
-
$
-
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$816
Cost:
-
- - - - - - - - $816 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$816
-
lb
-
-
$
-
-
$
08: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$741
Cost:
-
- - - - - - - - $741 1,373 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$741
1,373
lb
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$267
Cost:
$450
$56 1,758 - - - - $75 - - - $98 - $38 - $56
1,758
kWh
-
-
kW-months/year
-
-
MMBtu
$75
-
MMBtu
-
-
lb
$98
-
$
$38
-
$
TOTAL RECOMMENDED Savings:
$152,944
Cost:
$386,496
$19,991 677,316 $9,201 107 $22,648 9,352 $75 - $2,613 43,613 $98,378 - $38 - $19,991
677,316
kWh
$9,201
107
kW-months/year
$22,648
9,352
MMBtu
$75
-
MMBtu
$2,613
43,613
lb
$98,378
-
$
$38
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Energy Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Energy Solid Waste (non-haz) Personnel Changes Administrative Changes