IAC logo
IAC Assessment: OK0526
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0526
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1997
Principal Product Steel drums
NAICS n/a
SIC 3412 - Metal Barrels, Drums, And Pails
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 25,000
Annual Production 550,000 Pieces
Production Hrs. Annual 4,680
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $152,853 2,541,911 kWh $0.06
Electricity Demand $15,579 577 kW-months/year $27.00
Natural Gas $132,657 55,096 MMBtu $2.41
TOTAL ENERGY COSTS $292,426
RECOMMENDED SAVINGS* $27,189 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,401
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.4520 ELIMINATE SHIFT Savings:
$17,788
Cost:
$6,950
- - - - - - $17,788 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$17,788
-
$
02: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$5,426
Cost:
$11,087
$4,939 84,408 $487 216 - - - - $4,939
84,408
kWh
$487
216
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,291
Cost:
$3,370
$1,175 20,223 $116 51 - - - - $1,175
20,223
kWh
$116
51
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,086
Cost:
$2,477
$988 16,999 $98 43 - - - - $988
16,999
kWh
$98
43
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,323
Cost:
$4,055
$1,323 19,050 - - - - - - $1,323
19,050
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$275
Cost:
$363
- - - - $275 115 - - -
-
kWh
-
-
kW-months/year
$275
115
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$27,189
Cost:
$28,302
$8,425 140,680 $701 310 $275 115 $17,788 - $8,425
140,680
kWh
$701
310
kW-months/year
$275
115
MMBtu
$17,788
-
$
TOTAL IMPLEMENTED Savings:
$9,401
Cost:
$21,352
$8,425 140,680 $701 310 $275 115 - - $8,425
140,680
kWh
$701
310
kW-months/year
$275
115
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes