IAC logo
IAC Assessment: OK0527
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0527
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1997
Principal Product Baked goods
NAICS n/a
SIC 2051 - Bread, Cake, And Related Products
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 120,000
Annual Production 480,000,000 Pieces
Production Hrs. Annual 7,200
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $330,709 14,536,049 kWh $0.02
Electricity Demand $224,973 31,491 kW-months/year $7.14
Electricity Fees $3,314 - $ -
Natural Gas $64,801 22,725 MMBtu $2.85
TOTAL ENERGY COSTS $701,906
RECOMMENDED SAVINGS* $957,886 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $860,636
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$847,565
Cost:
$200,000
- - - - $847,565 18,983,346 - - -
-
kWh
-
-
kW-months/year
$847,565
18,983,346
lb
-
-
$
02: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$94,656
Cost:
$41,000
$(-114) (-2,638) - - - - $94,770 - $(-114)
(-2,638)
kWh
-
-
kW-months/year
-
-
lb
$94,770
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,517
Cost:
$18,540
$4,135 140,094 $1,382 192 - - - - $4,135
140,094
kWh
$1,382
192
kW-months/year
-
-
lb
-
-
$
04: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$3,375
Cost:
-
- - - - $3,375 270,000 - - -
-
kWh
-
-
kW-months/year
$3,375
270,000
lb
-
-
$
05: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$2,414
Cost:
$8,400
$1,809 61,254 $605 84 - - - - $1,809
61,254
kWh
$605
84
kW-months/year
-
-
lb
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,414
Cost:
$81
$1,809 61,254 $605 84 - - - - $1,809
61,254
kWh
$605
84
kW-months/year
-
-
lb
-
-
$
07: 2.2696 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS Savings:
$1,608
Cost:
$14,500
$1,608 70,926 - - - - - - $1,608
70,926
kWh
-
-
kW-months/year
-
-
lb
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$157
Cost:
$1,080
$118 4,103 $39 6 - - - - $118
4,103
kWh
$39
6
kW-months/year
-
-
lb
-
-
$
09: 3.1291 ELIMINATE PRACTICE OF MIXING WASTE STREAMS Savings:
$180
Cost:
-
- - - - $180 - - - -
-
kWh
-
-
kW-months/year
$180
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$957,886
Cost:
$283,601
$9,365 334,993 $2,631 366 $851,120 19,253,346 $94,770 - $9,365
334,993
kWh
$2,631
366
kW-months/year
$851,120
19,253,346
lb
$94,770
-
$
TOTAL IMPLEMENTED Savings:
$860,636
Cost:
$242,520
$7,670 276,377 $2,026 282 $850,940 19,253,346 - - $7,670
276,377
kWh
$2,026
282
kW-months/year
$850,940
19,253,346
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes