Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 1997 |
Principal Product | Baked goods |
NAICS | n/a |
SIC | 2051 - Bread, Cake, And Related Products |
Sales | $50,000,000-$100,000,000 |
# of Employees | 350 |
Plant Area (Sq.Ft.) | 120,000 |
Annual Production | 480,000,000 Pieces |
Production Hrs. Annual | 7,200 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $330,709 | 14,536,049 | kWh | $0.02 |
Electricity Demand | $224,973 | 31,491 | kW-months/year | $7.14 |
Electricity Fees | $3,314 | - | $ | - |
Natural Gas | $64,801 | 22,725 | MMBtu | $2.85 |
TOTAL ENERGY COSTS | $701,906 | |||
RECOMMENDED SAVINGS* | $957,886 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $860,636 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $847,565 Cost: $200,000 |
- | - | - | - | $847,565 | 18,983,346 | - | - |
- - kWh |
- - kW-months/year |
$847,565 18,983,346 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $94,656 Cost: $41,000 |
$(-114) | (-2,638) | - | - | - | - | $94,770 | - |
$(-114) (-2,638) kWh |
- - kW-months/year |
- - lb |
$94,770 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,517 Cost: $18,540 |
$4,135 | 140,094 | $1,382 | 192 | - | - | - | - |
$4,135 140,094 kWh |
$1,382 192 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $3,375 Cost: - |
- | - | - | - | $3,375 | 270,000 | - | - |
- - kWh |
- - kW-months/year |
$3,375 270,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $2,414 Cost: $8,400 |
$1,809 | 61,254 | $605 | 84 | - | - | - | - |
$1,809 61,254 kWh |
$605 84 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $2,414 Cost: $81 |
$1,809 | 61,254 | $605 | 84 | - | - | - | - |
$1,809 61,254 kWh |
$605 84 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2696 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS |
Savings: $1,608 Cost: $14,500 |
$1,608 | 70,926 | - | - | - | - | - | - |
$1,608 70,926 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $157 Cost: $1,080 |
$118 | 4,103 | $39 | 6 | - | - | - | - |
$118 4,103 kWh |
$39 6 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.1291 ELIMINATE PRACTICE OF MIXING WASTE STREAMS |
Savings: $180 Cost: - |
- | - | - | - | $180 | - | - | - |
- - kWh |
- - kW-months/year |
$180 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $957,886 Cost: $283,601 |
$9,365 | 334,993 | $2,631 | 366 | $851,120 | 19,253,346 | $94,770 | - | $9,365 334,993 kWh |
$2,631 366 kW-months/year |
$851,120 19,253,346 lb |
$94,770 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $860,636 Cost: $242,520 |
$7,670 | 276,377 | $2,026 | 282 | $850,940 | 19,253,346 | - | - | $7,670 276,377 kWh |
$2,026 282 kW-months/year |
$850,940 19,253,346 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes |