IAC Assessment: OK0531
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0531
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1997
Principal Product Swimming pool and hygiene chemicals
NAICS n/a
SIC 2812 - Alkalies And Chlorine
Sales $5,000,000-$10,000,000
# of Employees 55
Plant Area (Sq.Ft.) 140,000
Annual Production 6,000,000 Pounds
Production Hrs. Annual 2,600
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $33,835 1,333,236 kWh $0.03
Electricity Demand $44,183 4,627 kW-months/year $9.55
Electricity Fees $4,006 - $ -
Natural Gas $17,844 3,594 MMBtu $4.96
TOTAL ENERGY COSTS $108,408
RECOMMENDED SAVINGS* $85,780 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,079
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$21,470
Cost:
-
- - $21,470 2,248 - - - - -
-
kWh
$21,470
2,248
kW-months/year
-
-
lb
-
-
$
02: 2.7122 DISCONNECT BALLASTS Savings:
$1,079
Cost:
$500
$453 17,292 $626 79 - - - - $453
17,292
kWh
$626
79
kW-months/year
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$631
Cost:
$1,870
$194 7,327 $81 10 - - $356 - $194
7,327
kWh
$81
10
kW-months/year
-
-
lb
$356
-
$
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$8,000
Cost:
-
- - - - $8,000 - - - -
-
kWh
-
-
kW-months/year
$8,000
-
lb
-
-
$
05: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$27,300
Cost:
-
- - - - - - $27,300 - -
-
kWh
-
-
kW-months/year
-
-
lb
$27,300
-
$
06: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$27,300
Cost:
$150,000
- - - - - - $27,300 - -
-
kWh
-
-
kW-months/year
-
-
lb
$27,300
-
$
TOTAL RECOMMENDED Savings:
$85,780
Cost:
$152,370
$647 24,619 $22,177 2,337 $8,000 - $54,956 - $647
24,619
kWh
$22,177
2,337
kW-months/year
$8,000
-
lb
$54,956
-
$
TOTAL IMPLEMENTED Savings:
$9,079
Cost:
$500
$453 17,292 $626 79 $8,000 - - - $453
17,292
kWh
$626
79
kW-months/year
$8,000
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes