Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1997
Principal Product Office forms
NAICS n/a
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 100,000
Annual Production 2,000 Tons
Production Hrs. Annual 7,488
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $112,250 2,446,073 kWh $0.05
Electricity Fees $2,100 - $ -
Natural Gas $18,484 3,142 MMBtu $5.88
TOTAL ENERGY COSTS $135,029
RECOMMENDED SAVINGS* $40,025 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,293
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ MMBtu $ gal $ lb $ $ $ $
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$676
Cost:
$780
- - $676 99 - - - - - - - - -
-
kWh
$676
99
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$553
Cost:
$1,065
- - $553 81 - - - - - - - - -
-
kWh
$553
81
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$503
Cost:
-
$503 7,034 - - - - - - - - - - $503
7,034
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$33,000
Cost:
$65,000
- - - - - - $48,000 30,000 $(-15,000) - - - -
-
kWh
-
-
MMBtu
-
-
gal
$48,000
30,000
lb
$(-15,000)
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$793
Cost:
$1,000
$599 8,206 - - - - - - $194 - - - $599
8,206
kWh
-
-
MMBtu
-
-
gal
-
-
lb
$194
-
$
-
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$4,000
Cost:
-
- - - - - - $4,000 160,000 - - - - -
-
kWh
-
-
MMBtu
-
-
gal
$4,000
160,000
lb
-
-
$
-
-
$
07: 3.5121 RECYCLE WASTE INK AND CLEANUP SOLVENT Savings:
$500
Cost:
$1,300
- - - - $6,000 1,000 - - - - $(-5,500) - -
-
kWh
-
-
MMBtu
$6,000
1,000
gal
-
-
lb
-
-
$
$(-5,500)
-
$
TOTAL RECOMMENDED Savings:
$40,025
Cost:
$69,145
$1,102 15,240 $1,229 180 $6,000 1,000 $52,000 190,000 $(-14,806) - $(-5,500) - $1,102
15,240
kWh
$1,229
180
MMBtu
$6,000
1,000
gal
$52,000
190,000
lb
$(-14,806)
-
$
$(-5,500)
-
$
TOTAL IMPLEMENTED Savings:
$34,293
Cost:
$67,300
$599 8,206 - - $6,000 1,000 $48,000 30,000 $(-14,806) - $(-5,500) - $599
8,206
kWh
-
-
MMBtu
$6,000
1,000
gal
$48,000
30,000
lb
$(-14,806)
-
$
$(-5,500)
-
$
Savings
Cost
$ kWh $ MMBtu $ gal $ lb $ $ $ $
Electricity Usage Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes