IAC logo
IAC Assessment: OK0540
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0540
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1998
Principal Product Structural steel fabrication
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $100,000,000-$500,000,000
# of Employees 165
Plant Area (Sq.Ft.) 304,920
Annual Production 24,000 Tons
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $117,802 4,347,011 kWh $0.03
Electricity Demand $104,073 12,264 kW-months/year $8.49
Electricity Fees $1,620 - $ -
Natural Gas $127,098 31,118 MMBtu $4.08
TOTAL ENERGY COSTS $573,893
RECOMMENDED SAVINGS* $17,855 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$5,006
Cost:
$9,000
- - - - - - - - $5,006 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$5,006
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,180
Cost:
$2,828
$1,432 48,066 $748 88 - - - - - - - - $1,432
48,066
kWh
$748
88
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,129
Cost:
-
- - - - - - - - - - $2,129 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$2,129
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$783
Cost:
$1,188
$783 29,601 - - - - - - - - - - $783
29,601
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$1,226
Cost:
$5,610
- - - - $1,226 360 - - - - - - -
-
kWh
-
-
kW-months/year
$1,226
360
MMBtu
-
-
lb
-
-
$
-
-
$
06: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$6,531
Cost:
-
- - - - - - $6,531 250,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,531
250,000
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$17,855
Cost:
$18,626
$2,215 77,667 $748 88 $1,226 360 $6,531 250,000 $5,006 - $2,129 - $2,215
77,667
kWh
$748
88
kW-months/year
$1,226
360
MMBtu
$6,531
250,000
lb
$5,006
-
$
$2,129
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes