IAC logo
IAC Assessment: OK0541
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0541
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1998
Principal Product Pumps, compressors, valves
NAICS n/a
SIC 3563 - Air And Gas Compressors
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 42,000
Annual Production 17,500 Pieces
Production Hrs. Annual 7,200
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $48,393 1,785,756 kWh $0.03
Electricity Demand $107,683 10,833 kW-months/year $9.94
Natural Gas $12,151 2,888 MMBtu $4.21
TOTAL ENERGY COSTS $174,068
RECOMMENDED SAVINGS* $66,892 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,262
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,363
Cost:
$5,833
$2,146 79,132 $1,217 132 - - - - $2,146
79,132
kWh
$1,217
132
kW-months/year
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,554
Cost:
$1,917
$1,006 35,756 $548 59 - - - - $1,006
35,756
kWh
$548
59
kW-months/year
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$894
Cost:
-
$894 42,790 - - - - - - $894
42,790
kWh
-
-
kW-months/year
-
-
lb
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$759
Cost:
$516
$759 28,136 - - - - - - $759
28,136
kWh
-
-
kW-months/year
-
-
lb
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$443
Cost:
$99
$369 13,482 $74 23 - - - - $369
13,482
kWh
$74
23
kW-months/year
-
-
lb
-
-
$
06: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$48,000
Cost:
$15,312
- - - - - - $48,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$48,000
-
$
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$10,080
Cost:
-
- - - - $10,080 120,000 - - -
-
kWh
-
-
kW-months/year
$10,080
120,000
lb
-
-
$
08: 3.4155 METER WASTE WATER Savings:
$1,317
Cost:
-
- - - - - - $1,317 - -
-
kWh
-
-
kW-months/year
-
-
lb
$1,317
-
$
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$352
Cost:
-
- - - - $352 - - - -
-
kWh
-
-
kW-months/year
$352
-
lb
-
-
$
10: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$130
Cost:
-
- - - - $130 - - - -
-
kWh
-
-
kW-months/year
$130
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$66,892
Cost:
$23,677
$5,174 199,296 $1,839 214 $10,562 120,000 $49,317 - $5,174
199,296
kWh
$1,839
214
kW-months/year
$10,562
120,000
lb
$49,317
-
$
TOTAL IMPLEMENTED Savings:
$63,262
Cost:
$21,244
$3,409 135,404 $1,291 155 $10,562 120,000 $48,000 - $3,409
135,404
kWh
$1,291
155
kW-months/year
$10,562
120,000
lb
$48,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes