IAC logo
IAC Assessment: OK0544
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0544
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1998
Principal Product Computers
NAICS n/a
SIC 3572 - Computer Storage Devices
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 150,000
Annual Production 140,000 Units
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $158,316 5,555,979 kWh $0.03
Electricity Demand $121,457 12,783 kW-months/year $9.50
Natural Gas $107,257 27,753 MMBtu $3.86
TOTAL ENERGY COSTS $365,853
RECOMMENDED SAVINGS* $64,107 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $54,962
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$4,481
Cost:
$320
- - - - $4,481 1,193 - - - - - - -
-
kWh
-
-
kW-months/year
$4,481
1,193
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,223
Cost:
$837
$1,223 45,135 - - - - - - - - - - $1,223
45,135
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$846
Cost:
$300
$456 16,706 $208 23 - - - - $182 - - - $456
16,706
kWh
$208
23
kW-months/year
-
-
MMBtu
-
-
lb
$182
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$728
Cost:
$548
$445 16,413 $283 32 - - - - - - - - $445
16,413
kWh
$283
32
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$196
Cost:
$329
$86 3,224 $130 15 - - - - - - $(-20) - $86
3,224
kWh
$130
15
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$(-20)
-
$
06: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$50,125
Cost:
$39,400
- - - - - - - - $50,125 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$50,125
-
$
-
-
$
07: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$6,348
Cost:
-
- - - - - - - - $6,348 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$6,348
-
$
-
-
$
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$160
Cost:
-
- - - - - - $160 17,651 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$160
17,651
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$64,107
Cost:
$41,734
$2,210 81,478 $621 70 $4,481 1,193 $160 17,651 $56,655 - $(-20) - $2,210
81,478
kWh
$621
70
kW-months/year
$4,481
1,193
MMBtu
$160
17,651
lb
$56,655
-
$
$(-20)
-
$
TOTAL IMPLEMENTED Savings:
$54,962
Cost:
$40,049
$86 3,224 $130 15 $4,481 1,193 $160 17,651 $50,125 - $(-20) - $86
3,224
kWh
$130
15
kW-months/year
$4,481
1,193
MMBtu
$160
17,651
lb
$50,125
-
$
$(-20)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost