Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 1998 |
Principal Product | Livestock Feeds |
NAICS | n/a |
SIC | 2048 - Prepared Feeds, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 30 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 130,000 Tons |
Production Hrs. Annual | 5,200 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $99,089 | 3,472,743 | kWh | $0.03 |
Electricity Demand | $98,441 | - | kW-months/year | - |
Electricity Fees | $6,064 | - | $ | - |
Natural Gas | $47,109 | 11,258 | MMBtu | $4.18 |
TOTAL ENERGY COSTS | $250,903 | |||
RECOMMENDED SAVINGS* | $44,457 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,124 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,871 Cost: $1,728 |
$1,654 | 60,961 | $1,217 | 136 | - | - | - | - | - | - | - | - |
$1,654 60,961 kWh |
$1,217 136 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,968 Cost: $1,477 |
$780 | 28,722 | $574 | 64 | - | - | - | - | - | - | $614 | - |
$780 28,722 kWh |
$574 64 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$614 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $1,164 Cost: $146 |
- | - | - | - | $1,164 | 288 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,164 288 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,020 Cost: $400 |
$1,020 | 37,515 | - | - | - | - | - | - | - | - | - | - |
$1,020 37,515 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,104 Cost: $1,566 |
$1,104 | 37,808 | - | - | - | - | - | - | - | - | - | - |
$1,104 37,808 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $34,130 Cost: $12,800 |
- | - | - | - | - | - | - | - | $8,130 | - | $26,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$8,130 - $ |
$26,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $2,200 Cost: $6,000 |
- | - | - | - | - | - | $2,200 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,200 - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $44,457 Cost: $24,117 |
$4,558 | 165,006 | $1,791 | 200 | $1,164 | 288 | $2,200 | - | $8,130 | - | $26,614 | - | $4,558 165,006 kWh |
$1,791 200 kW-months/year |
$1,164 288 MMBtu |
$2,200 - lb |
$8,130 - $ |
$26,614 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,124 Cost: $1,966 |
$2,124 | 75,323 | - | - | - | - | - | - | - | - | - | - | $2,124 75,323 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost |