IAC logo
IAC Assessment: OK0551
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0551
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1998
Principal Product Foam for furniture and bedding
NAICS n/a
SIC 3086 - Plastics Foam Products
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 250,000
Annual Production 10,300 Thousand Feet
Production Hrs. Annual 2,080
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,922 1,498,828 kWh $0.02
Electricity Demand $31,289 - kW-months/year -
Electricity Fees $1,461 - $ -
Natural Gas $58,806 11,040 MMBtu $5.33
TOTAL ENERGY COSTS $346,278
RECOMMENDED SAVINGS* $39,833 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,724
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$898
Cost:
$80,000
$383 15,533 $515 (-7) - - - - $383
15,533
kWh
$515
(-7)
kW-months/year
-
-
lb
-
-
$
02: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$29,885
Cost:
-
- - - - - - $29,885 - -
-
kWh
-
-
kW-months/year
-
-
lb
$29,885
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,224
Cost:
$9,700
- - - - $2,224 - - - -
-
kWh
-
-
kW-months/year
$2,224
-
lb
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,304
Cost:
-
- - $4,304 - - - - - -
-
kWh
$4,304
-
kW-months/year
-
-
lb
-
-
$
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$2,522
Cost:
-
- - - - - - $2,522 - -
-
kWh
-
-
kW-months/year
-
-
lb
$2,522
-
$
TOTAL RECOMMENDED Savings:
$39,833
Cost:
$89,700
$383 15,533 $4,819 (-7) $2,224 - $32,407 - $383
15,533
kWh
$4,819
(-7)
kW-months/year
$2,224
-
lb
$32,407
-
$
TOTAL IMPLEMENTED Savings:
$7,724
Cost:
$80,000
$383 15,533 $4,819 (-7) - - $2,522 - $383
15,533
kWh
$4,819
(-7)
kW-months/year
-
-
lb
$2,522
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes