IAC logo
IAC Assessment: OK0554
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0554
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1998
Principal Product Fans
NAICS n/a
SIC 3564 - Blowers And Fans
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 354,418
Annual Production 85,000 Pounds
Production Hrs. Annual 4,680
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $99,919 3,611,958 kWh $0.03
Electricity Demand $90,832 - kW-months/year -
Natural Gas $122,837 29,175 MMBtu $4.21
TOTAL ENERGY COSTS $173,991
RECOMMENDED SAVINGS* $250,659 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,636
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,306
Cost:
$13,340
$2,675 94,373 $2,174 242 - - - - - - - - $(-1,543) - $2,675
94,373
kWh
$2,174
242
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$(-1,543)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$571
Cost:
$2,830
$373 12,309 $229 32 - - - - - - - - $(-31) - $373
12,309
kWh
$229
32
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$(-31)
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$12,689
Cost:
$4,620
$12,689 77,374 - - - - - - - - - - - - $12,689
77,374
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$258
Cost:
$544
$58 2,052 $36 5 - - - - - - - - $164 - $58
2,052
kWh
$36
5
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$164
-
$
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$17,170
Cost:
$97,980
- - - - $17,170 9,809 - - - - - - - - -
-
kWh
-
-
kW-months/year
$17,170
9,809
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$812
Cost:
-
- - - - - - $812 1,195 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$812
1,195
Tgal
-
-
lb
-
-
$
-
-
$
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$3,600
Cost:
-
- - - - - - - - $3,600 144,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$3,600
144,000
lb
-
-
$
-
-
$
08: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$210,600
Cost:
$120,000
- - - - - - - - - - $210,600 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$210,600
-
$
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,653
Cost:
$3,170
$1,653 56,272 - - - - - - - - - - - - $1,653
56,272
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$250,659
Cost:
$242,484
$17,448 242,380 $2,439 279 $17,170 9,809 $812 1,195 $3,600 144,000 $210,600 - $(-1,410) - $17,448
242,380
kWh
$2,439
279
kW-months/year
$17,170
9,809
MMBtu
$812
1,195
Tgal
$3,600
144,000
lb
$210,600
-
$
$(-1,410)
-
$
TOTAL IMPLEMENTED Savings:
$6,636
Cost:
$6,000
$2,026 68,581 $229 32 - - $812 1,195 $3,600 144,000 - - $(-31) - $2,026
68,581
kWh
$229
32
kW-months/year
-
-
MMBtu
$812
1,195
Tgal
$3,600
144,000
lb
-
-
$
$(-31)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost