Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 1999 |
Principal Product | Folding aluminum camping furniture |
NAICS | n/a |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 125 |
Plant Area (Sq.Ft.) | 135,000 |
Annual Production | 2,500,000 Pounds |
Production Hrs. Annual | 2,210 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $25,160 | 486,518 | kWh | $0.05 |
Electricity Fees | $324 | - | $ | - |
Natural Gas | $18,068 | 2,749 | MMBtu | $6.57 |
TOTAL ENERGY COSTS | $(-1,448) | |||
RECOMMENDED SAVINGS* | $85,737 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $84,941 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7122 DISCONNECT BALLASTS |
Savings: $49 Cost: $429 |
$49 | 2,052 | - | - | - | - | - | - |
$49 2,052 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $657 Cost: $2,127 |
- | - | $657 | 100 | - | - | - | - |
- - kWh |
$657 100 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $139 Cost: $171 |
$139 | 5,862 | - | - | - | - | - | - |
$139 5,862 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.311 SCHEDULE DELIVERIES ACCORDING TO DEMAND |
Savings: $4,000 Cost: - |
- | - | - | - | - | - | $4,000 | - |
- - kWh |
- - MMBtu |
- - lb |
$4,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $382 Cost: $529 |
$382 | 24,326 | - | - | - | - | - | - |
$382 24,326 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
Savings: $4,010 Cost: $15,000 |
- | - | - | - | - | - | $4,010 | - |
- - kWh |
- - MMBtu |
- - lb |
$4,010 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.1192 REDUCE SCRAP PRODUCTION |
Savings: $76,500 Cost: $40,000 |
- | - | - | - | $76,500 | - | - | - |
- - kWh |
- - MMBtu |
$76,500 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $85,737 Cost: $58,256 |
$570 | 32,240 | $657 | 100 | $76,500 | - | $8,010 | - | $570 32,240 kWh |
$657 100 MMBtu |
$76,500 - lb |
$8,010 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $84,941 Cost: $55,958 |
$431 | 26,378 | - | - | $76,500 | - | $8,010 | - | $431 26,378 kWh |
- - MMBtu |
$76,500 - lb |
$8,010 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost |