IAC Assessment: OK0567
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0567
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1999
Principal Product Folding aluminum camping furniture
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 125
Plant Area (Sq.Ft.) 135,000
Annual Production 2,500,000 Pounds
Production Hrs. Annual 2,210
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $25,160 486,518 kWh $0.05
Electricity Fees $324 - $ -
Natural Gas $18,068 2,749 MMBtu $6.57
TOTAL ENERGY COSTS $(-1,448)
RECOMMENDED SAVINGS* $85,737 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $84,941
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Natural Gas Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ MMBtu $ lb $ $
01: 2.7122 DISCONNECT BALLASTS Savings:
$49
Cost:
$429
$49 2,052 - - - - - - $49
2,052
kWh
-
-
MMBtu
-
-
lb
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$657
Cost:
$2,127
- - $657 100 - - - - -
-
kWh
$657
100
MMBtu
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$139
Cost:
$171
$139 5,862 - - - - - - $139
5,862
kWh
-
-
MMBtu
-
-
lb
-
-
$
04: 4.311 SCHEDULE DELIVERIES ACCORDING TO DEMAND Savings:
$4,000
Cost:
-
- - - - - - $4,000 - -
-
kWh
-
-
MMBtu
-
-
lb
$4,000
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$382
Cost:
$529
$382 24,326 - - - - - - $382
24,326
kWh
-
-
MMBtu
-
-
lb
-
-
$
06: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$4,010
Cost:
$15,000
- - - - - - $4,010 - -
-
kWh
-
-
MMBtu
-
-
lb
$4,010
-
$
07: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$76,500
Cost:
$40,000
- - - - $76,500 - - - -
-
kWh
-
-
MMBtu
$76,500
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$85,737
Cost:
$58,256
$570 32,240 $657 100 $76,500 - $8,010 - $570
32,240
kWh
$657
100
MMBtu
$76,500
-
lb
$8,010
-
$
TOTAL IMPLEMENTED Savings:
$84,941
Cost:
$55,958
$431 26,378 - - $76,500 - $8,010 - $431
26,378
kWh
-
-
MMBtu
$76,500
-
lb
$8,010
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Natural Gas Solid Waste (non-haz) Ancillary Material Cost