IAC logo
IAC Assessment: OK0570
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0570
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1999
Principal Product Transformers
NAICS n/a
SIC 3612 - Transformers, Except Electronic
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 80,000
Annual Production 72 Pieces
Production Hrs. Annual 3,840
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $65,584 1,179,660 kWh $0.06
Electricity Demand $49,130 - kW-months/year -
Electricity Fees $1,098 - $ -
Natural Gas $21,429 8,745 MMBtu $2.45
TOTAL ENERGY COSTS $203,741
RECOMMENDED SAVINGS* $57,502 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ MMBtu $ gal $ lb $ $ $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$726
Cost:
$2,286
$726 24,326 - - - - - - - - - - $726
24,326
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$333
Cost:
-
- - - - - - - - - - $333 - -
-
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
$333
-
$
03: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$40,159
Cost:
$2,880
- - - - - - - - $40,159 - - - -
-
kWh
-
-
MMBtu
-
-
gal
-
-
lb
$40,159
-
$
-
-
$
04: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL Savings:
$12,000
Cost:
$17,070
- - - - $12,000 12,342 - - - - - - -
-
kWh
-
-
MMBtu
$12,000
12,342
gal
-
-
lb
-
-
$
-
-
$
05: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$665
Cost:
-
- - $665 272 - - - - - - - - -
-
kWh
$665
272
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$400
Cost:
-
- - - - - - $400 - - - - - -
-
kWh
-
-
MMBtu
-
-
gal
$400
-
lb
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$519
Cost:
$150
$519 9,379 - - - - - - - - - - $519
9,379
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
08: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$2,700
Cost:
-
- - - - - - $2,700 8,400 - - - - -
-
kWh
-
-
MMBtu
-
-
gal
$2,700
8,400
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$57,502
Cost:
$22,386
$1,245 33,705 $665 272 $12,000 12,342 $3,100 8,400 $40,159 - $333 - $1,245
33,705
kWh
$665
272
MMBtu
$12,000
12,342
gal
$3,100
8,400
lb
$40,159
-
$
$333
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ gal $ lb $ $ $ $
Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes