Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 1999 |
Principal Product | Winches, Wheel Drives, and Hoists |
NAICS | n/a |
SIC | 3531 - Construction Machinery |
Sales | $50,000,000-$100,000,000 |
# of Employees | 60 |
Plant Area (Sq.Ft.) | 160,000 |
Annual Production | 7,000 Pieces |
Production Hrs. Annual | 6,800 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $176,105 | 7,092,614 | kWh | $0.02 |
Electricity Demand | $14,747 | - | kW-months/year | - |
Natural Gas | $71,347 | 20,311 | MMBtu | $3.51 |
TOTAL ENERGY COSTS | $382,126 | |||
RECOMMENDED SAVINGS* | $45,334 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,161 |
#|Description |
Savings Cost |
Status | Electricity Usage | Solid Waste (haz) | Administrative Changes | Electricity Usage | Solid Waste (haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,582 Cost: $16,945 |
$5,582 | 135,991 | - | - | - | - |
$5,582 135,991 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $15,215 Cost: $45,737 |
$15,215 | 279,601 | - | - | - | - |
$15,215 279,601 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,266 Cost: $1,900 |
$3,266 | 109,320 | - | - | - | - |
$3,266 109,320 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $545 Cost: $246 |
$545 | 14,068 | - | - | - | - |
$545 14,068 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $13,831 Cost: $8,000 |
- | - | $13,831 | - | - | - |
- - kWh |
$13,831 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $6,895 Cost: $34,750 |
- | - | - | - | $6,895 | - |
- - kWh |
- - lb |
$6,895 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $45,334 Cost: $107,578 |
$24,608 | 538,980 | $13,831 | - | $6,895 | - | $24,608 538,980 kWh |
$13,831 - lb |
$6,895 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,161 Cost: $36,650 |
$3,266 | 109,320 | - | - | $6,895 | - | $3,266 109,320 kWh |
- - lb |
$6,895 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Solid Waste (haz) | Administrative Changes | Electricity Usage | Solid Waste (haz) | Administrative Changes |