Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 1999 |
Principal Product | FRP Pipe & Fittings |
NAICS | n/a |
SIC | 3084 - Plastics Pipe |
Sales | $10,000,000-$50,000,000 |
# of Employees | 130 |
Plant Area (Sq.Ft.) | 230,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 4,000 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $201,043 | 7,688,453 | kWh | $0.03 |
Electricity Demand | $91,690 | - | kW-months/year | - |
Natural Gas | $234,034 | 80,366 | MMBtu | $2.91 |
TOTAL ENERGY COSTS | $528,375 | |||
RECOMMENDED SAVINGS* | $47,564 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $34,029 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN |
Savings: $11,368 Cost: $16,000 |
- | - | - | - | $11,368 | 3,904 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$11,368 3,904 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,672 Cost: $17,813 |
$3,833 | 154,162 | $2,839 | 260 | - | - | - | - | - | - | - | - |
$3,833 154,162 kWh |
$2,839 260 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $279 Cost: $140 |
$279 | 15,240 | - | - | - | - | - | - | - | - | - | - |
$279 15,240 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $228 Cost: $68 |
$228 | 9,086 | - | - | - | - | - | - | - | - | - | - |
$228 9,086 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $22,560 Cost: $40,000 |
- | - | - | - | - | - | - | - | $22,560 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$22,560 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $4,518 Cost: $3,990 |
- | - | - | - | - | - | - | - | - | - | $4,518 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$4,518 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $1,939 Cost: $5,000 |
- | - | - | - | - | - | $1,939 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,939 - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $47,564 Cost: $83,011 |
$4,340 | 178,488 | $2,839 | 260 | $11,368 | 3,904 | $1,939 | - | $22,560 | - | $4,518 | - | $4,340 178,488 kWh |
$2,839 260 kW-months/year |
$11,368 3,904 MMBtu |
$1,939 - lb |
$22,560 - $ |
$4,518 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $34,029 Cost: $61,943 |
$4,112 | 169,402 | $2,839 | 260 | - | - | - | - | $22,560 | - | $4,518 | - | $4,112 169,402 kWh |
$2,839 260 kW-months/year |
- - MMBtu |
- - lb |
$22,560 - $ |
$4,518 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes |