IAC logo
IAC Assessment: OK0577
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0577
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1999
Principal Product Vitamins
NAICS n/a
SIC 2834 - Pharmaceutical Preparations
Sales $10,000,000-$50,000,000
# of Employees 240
Plant Area (Sq.Ft.) 400,000
Annual Production 15,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $511,740 18,710,434 kWh $0.03
Electricity Demand $202,590 - kW-months/year -
Electricity Fees $(-8,483) - $ -
Natural Gas $233,529 91,149 MMBtu $2.56
TOTAL ENERGY COSTS $969,280
RECOMMENDED SAVINGS* $48,070 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,247
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$28,907
Cost:
-
- - - - - - - - $28,907 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$28,907
-
$
-
-
$
02: 3.6122 INSTALL SOLID WASTE INCINERATOR FOR HEAT Savings:
$7,077
Cost:
-
- - - - - - $7,077 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,077
-
lb
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,306
Cost:
$5,625
$4,052 157,679 $1,254 216 - - - - - - - - $4,052
157,679
kWh
$1,254
216
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,556
Cost:
$117
$1,952 75,909 $604 104 - - - - - - - - $1,952
75,909
kWh
$604
104
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,344
Cost:
$1,600
$428 16,706 $132 23 - - - - - - $784 - $428
16,706
kWh
$132
23
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$784
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,179
Cost:
$1,380
$923 19,930 $256 49 - - - - - - - - $923
19,930
kWh
$256
49
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$784
Cost:
$3,820
$784 89,683 - - - - - - - - - - $784
89,683
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 2.6232 INSTALL SET-BACK TIMERS Savings:
$692
Cost:
$1,050
- - - - $692 270 - - - - - - -
-
kWh
-
-
kW-months/year
$692
270
MMBtu
-
-
lb
-
-
$
-
-
$
09: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$225
Cost:
$161
$136 1,172 $89 11 - - - - - - - - $136
1,172
kWh
$89
11
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$48,070
Cost:
$13,753
$8,275 361,079 $2,335 403 $692 270 $7,077 - $28,907 - $784 - $8,275
361,079
kWh
$2,335
403
kW-months/year
$692
270
MMBtu
$7,077
-
lb
$28,907
-
$
$784
-
$
TOTAL IMPLEMENTED Savings:
$32,247
Cost:
$3,937
$2,736 165,592 $604 104 - - - - $28,907 - - - $2,736
165,592
kWh
$604
104
kW-months/year
-
-
MMBtu
-
-
lb
$28,907
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes