Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 1999 |
Principal Product | Electric motor repair |
NAICS | n/a |
SIC | 3621 - Motors And Generators |
Sales | $5,000,000-$10,000,000 |
# of Employees | 32 |
Plant Area (Sq.Ft.) | 125,000 |
Annual Production | 520 Pieces |
Production Hrs. Annual | 5,200 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $21,772 | 771,688 | kWh | $0.03 |
Electricity Demand | $25,430 | - | kW-months/year | - |
Electricity Fees | $3,944 | - | $ | - |
Natural Gas | $30,033 | 6,960 | MMBtu | $4.32 |
TOTAL ENERGY COSTS | $40,619 | |||
RECOMMENDED SAVINGS* | $19,106 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Water Disposal | Personnel Changes | Electricity Usage | Electricity Fees | Water Disposal | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $1,087 Cost: $500 |
- | - | - | - | $1,087 | - | - | - |
- - kWh |
- - $ |
$1,087 - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $294 Cost: $110 |
$294 | 4,689 | - | - | - | - | - | - |
$294 4,689 kWh |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $325 Cost: $2,165 |
$325 | 10,551 | - | - | - | - | - | - |
$325 10,551 kWh |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE |
Savings: $7,200 Cost: $1,680 |
- | - | - | - | - | - | $7,200 | - |
- - kWh |
- - $ |
- - Tgal |
$7,200 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3512 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY |
Savings: $9,766 Cost: $12,000 |
- | - | $9,766 | - | - | - | - | - |
- - kWh |
$9,766 - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $434 Cost: $6,549 |
$434 | 7,034 | - | - | - | - | - | - |
$434 7,034 kWh |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $19,106 Cost: $23,004 |
$1,053 | 22,274 | $9,766 | - | $1,087 | - | $7,200 | - | $1,053 22,274 kWh |
$9,766 - $ |
$1,087 - Tgal |
$7,200 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Water Disposal | Personnel Changes | Electricity Usage | Electricity Fees | Water Disposal | Personnel Changes |