IAC logo
IAC Assessment: OK0590
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0590
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2000
Principal Product Structural Steel
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 55,000
Annual Production 6,480 Tons
Production Hrs. Annual 2,720
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $36,842 542,204 kWh $0.07
Electricity Demand $37,526 9,168 kW-months/year $4.09
Electricity Fees $685 - $ -
Natural Gas $10,075 2,194 MMBtu $4.59
TOTAL ENERGY COSTS $79,593
RECOMMENDED SAVINGS* $32,504 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,635
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$17,680
Cost:
$250
- - - - $17,680 - -
-
kWh
-
-
MMBtu
$17,680
-
$
02: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$5,824
Cost:
$3,443
- - - - $5,824 - -
-
kWh
-
-
MMBtu
$5,824
-
$
03: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$2,892
Cost:
$3,490
- - $2,892 630 - - -
-
kWh
$2,892
630
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,604
Cost:
$5,081
$2,604 34,877 - - - - $2,604
34,877
kWh
-
-
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,743
Cost:
$1,613
$2,743 40,445 - - - - $2,743
40,445
kWh
-
-
MMBtu
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$761
Cost:
$1,440
$761 11,137 - - - - $761
11,137
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$32,504
Cost:
$15,317
$6,108 86,459 $2,892 630 $23,504 - $6,108
86,459
kWh
$2,892
630
MMBtu
$23,504
-
$
TOTAL IMPLEMENTED Savings:
$5,635
Cost:
$5,103
$2,743 40,445 $2,892 630 - - $2,743
40,445
kWh
$2,892
630
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes