IAC logo
IAC Assessment: OK0591
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0591
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2000
Principal Product Rebuilt Transmissions
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 600
Plant Area (Sq.Ft.) 220,000
Annual Production 146,332 Pieces
Production Hrs. Annual 4,940
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $152,348 6,566,530 kWh $0.02
Electricity Demand $119,234 - kW-months/year -
Natural Gas $76,726 26,593 MMBtu $2.89
TOTAL ENERGY COSTS $1,627,706
RECOMMENDED SAVINGS* $214,164 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,792
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$315
Cost:
$1,900
$315 13,834 - - - - - - - - $315
13,834
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,477
Cost:
$4,942
$1,477 64,185 - - - - - - - - $1,477
64,185
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$875
Cost:
$136
- - $875 130 - - - - - - -
-
kWh
$875
130
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
04: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$9,042
Cost:
$230,000
- - - - $9,042 - - - - - -
-
kWh
-
-
kW-months/year
$9,042
-
MMBtu
-
-
gal
-
-
$
05: 3.3125 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS Savings:
$181,048
Cost:
$59,400
- - - - - - $181,048 805,501 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$181,048
805,501
gal
-
-
$
06: 4.3230 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS Savings:
$21,407
Cost:
$30,000
- - - - - - - - $21,407 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$21,407
-
$
TOTAL RECOMMENDED Savings:
$214,164
Cost:
$326,378
$1,792 78,019 $875 130 $9,042 - $181,048 805,501 $21,407 - $1,792
78,019
kWh
$875
130
kW-months/year
$9,042
-
MMBtu
$181,048
805,501
gal
$21,407
-
$
TOTAL IMPLEMENTED Savings:
$1,792
Cost:
$6,842
$1,792 78,019 - - - - - - - - $1,792
78,019
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes