IAC logo
IAC Assessment: OK0592
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0592
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2000
Principal Product Plastic Moldings
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 32
Plant Area (Sq.Ft.) 27,000
Annual Production 2,400,000 Pounds
Production Hrs. Annual 7,488
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,342 1,244,725 kWh $0.08
Electricity Demand $31,289 5,006 kW-months/year $6.25
Electricity Fees $7,602 - $ -
Natural Gas $939 123 MMBtu $7.63
TOTAL ENERGY COSTS $184,527
RECOMMENDED SAVINGS* $245,967 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$590
Cost:
$2,931
$606 7,620 $75 12 - - - - - - $(-91) - $606
7,620
kWh
$75
12
kW-months/year
-
-
lb
-
-
$
-
-
$
$(-91)
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$62,354
Cost:
$10,000
$62,354 761,430 - - - - - - - - - - $62,354
761,430
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,959
Cost:
$6,951
$6,959 85,873 - - - - - - - - - - $6,959
85,873
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
04: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$62,772
Cost:
$17,378
- - - - - - - - $62,772 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$62,772
-
$
-
-
$
05: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$112,320
Cost:
$19,390
- - - - - - $112,320 - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$112,320
-
$
-
-
$
-
-
$
06: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$972
Cost:
-
- - - - $972 64,800 - - - - - - -
-
kWh
-
-
kW-months/year
$972
64,800
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$245,967
Cost:
$56,650
$69,919 854,923 $75 12 $972 64,800 $112,320 - $62,772 - $(-91) - $69,919
854,923
kWh
$75
12
kW-months/year
$972
64,800
lb
$112,320
-
$
$62,772
-
$
$(-91)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost